cocomooner
英文原文:keykettlelocklettermilkmapcagenurse英式音标:[kiː][ˈket(ə)l][lɒk][ˈletə][mɪlk][mæp][keɪdʒ][nɜːs]美式音标:yinbiao5.com[kiː][ˈkɛtl][lɑk][ˈlɛtɚ][mɪlk][mæp][kedʒ][nɝs]
人到中年156
1.北京奥运国家体育场就是俗称的"鸟巢"
"鸟巢"的英文名称是Nest-type Beijing Olympic Stadium或者Beijing National Stadium (Bird's Nest/Olympic Stadium)
鸟巢英文单词是bird nest
2."水立方"的英文是water cube Beijing National Aquatics Cente或water cube
“鸟巢”和“水立方”的英文简介
Beijing National Stadium
The Beijing National Stadium (traditional Chinese: 北京国家体育场; simplified Chinese: 北京国家体育场; Hanyu Pinyin: Běijīng Guojiā Tǐyuchǎng; Tongyong Pinyin: Běijīng Guojiā Tǐyuchǎng), also known as the National Stadium,[1] or the "Bird's Nest" (鸟巢) for its architecture, is a stadium under construction on the Olympic Green in Beijing, China that is scheduled for completion in March, 2008[2]. The stadium will host the main track and field competitions for the 2008 Summer Olympics, as well as the opening and closing ceremonies. It is located right next to the Beijing National Aquatics Centre.
Design
In 2002, Government officials engaged architects worldwide in a design competition. Pritzker Prize-winning architects Herzog & de Meuron collaborated with ArupSport and China Architecture Design & Research Group to win the competition. Contemporary Chinese artist, Ai Weiwei, is the Artistic Consultant for design.[3] The ground was broken on Christmas EveDecember2003, and construction started in March2004, but was halted by the high construction cost in August2004 and continued again. In January 2008, concerns about construction working conditions arose when it was revealed that at least 10 workers had died during the stadium's construction.[4] Controversy also surrounded the alleged forced evictions of many residents so the construction could go ahead.
Capacity
The stadium can seat as many as 91,000 spectators during the Olympics. The capacity will then be reduced to 80,000 after the Games. It has replaced the original intended venue of the Guangdong Olympic Stadium[citation needed]. The stadium is 330 metres long by 220 metres wide, and is 69.2 metres tall. The stadium uses 258,000 square metres of space and has a usable area of 204,000 square metres. It was built with 36 km of unwrapped steel, with a combined weight of 45,000 tonnes. The stadium has some 11,000 square metres of underground rooms with waterproof walls. The stadium will cost up to 3.5 billionyuan (≈423 million USD).
Upon completion, this stadium will boast a state of the art Solar PV system produced by Suntech Power[
Beijing National Aquatics Centre
The Beijing National Aquatics Centre, also known as the Water Cube (or abbreviated [H2O]3 [1]), is an aquatics centre that was built alongside Beijing National Stadium in the Olympic Green for the 2008 Summer Olympics. Ground was broken on December 24, 2003.
Design
In 2002, Government officials engaged architects worldwide in a design competition. Pritzker Prize-winning architects Herzog & de Meuron collaborated with ArupSport and China Architecture Design & Research Group to win the competition. Contemporary Chinese artist, Ai Weiwei, is the Artistic Consultant for design.[3] The ground was broken on Christmas EveDecember2003, and construction started in March2004, but was halted by the high construction cost in August2004 and continued again. In January 2008, concerns about construction working conditions arose when it was revealed that at least 10 workers had died during the stadium's construction.[4] Controversy also surrounded the alleged forced evictions of many residents so the construction could go ahead.
Capacity
The stadium can seat as many as 91,000 spectators during the Olympics. The capacity will then be reduced to 80,000 after the Games. It has replaced the original intended venue of the Guangdong Olympic Stadium[citation needed]. The stadium is 330 metres long by 220 metres wide, and is 69.2 metres tall. The stadium uses 258,000 square metres of space and has a usable area of 204,000 square metres. It was built with 36 km of unwrapped steel, with a combined weight of 45,000 tonnes. The stadium has some 11,000 square metres of underground rooms with waterproof walls. The stadium will cost up to 3.5 billionyuan (≈423 million USD).
Upon completion, this stadium will boast a state of the art Solar PV system produced by
Suntech Power[
创艺麦香包
National Aquatic Center 水立方 Beijing National Stadium (Bird's Nest/Olympic Stadium)鸟巢
Summer若然霜寒
bird's nest n.
bird
英 [bɜːd] 美 [bɜːrd]
名词 n. 鸟;年轻女子,姑娘;人,家伙;飞机,飞船,卫星;供捕猎(或食用)的鸟;羽毛球;<英,非正式>监狱,服刑期(doing bird);喝倒彩,起哄(give sb. the bird)
【名】 (Bird)(英、西)伯德(人名)
vi. 猎鸟;观察研究野鸟
n. (Bird)人名;(英、西)伯德
近义词:
apple
英 [ˈæpl] 美 [ˈæpl]
n. 苹果
短语
apple inc 苹果公司 ; 美国苹果公司 ; 苹果
薛苏一世
问题一:鸟巢和水立方的英文怎么说? National Aquatic Center 水立方 Beijing National Stadium (Bird's Nest/Olympic Stadium)鸟巢 问题二:鸟巢英文怎么读 nest 英[nest] 美[n?st] 可百度翻译上听发音fanyi.baidu/?aldtype=85#en/zh/nest 问题三:鸟巢和水立方用英语怎么说啊? 鸟巢:Beijing National鼎Stadium (Bird's Nest/Olympic Stadium) 水立方:National Swimming Center (The water Cube) 问题四:水立方和鸟巢用英语怎么说 鸟巢:Bird's Nest 水立方:Water Cube 这是形象的说法。按体育馆翻译分别是 国家体育场:National Stadium 国家游泳中心:National Aquatics Center 问题五:鸟巢和水立方用英语怎么说 可以说成: 1)鸟巢:Beijing National Stadium或者Bird's Nest 2)水立方:Water Cube 问题六:鸟巢,国家体育场用英语怎么说? Nest, the National Stadium 问题七:鸟巢和水立方的英文简介? Beijing National Stadium (Bird's Nest/Olympic Stadium) The Beijing National Stadium, also known as the bird's nest will be the main track and field stadium for the 2008 Summer Olympics and will be host to the Opening and Closing ceremonies. In 2002 Government officials engaged architects worldwide in a design petition. Pritzker Prize-winning architects Herzog & de Meuron collaborated with ArupSport and China Architecture Design & Research Group to win he petition. The stadium will seat as many as 100,000 spectators during the Olympics, but this will be reduced to 80,000 after the games. It has replaced the original intended venue of the Guangdong Olympic Stadium. The stadium is 330 metres long by 220 metres wide, and is 69.2 metres tall. The 250,000 square metre (gross floor area) stadium is to be built with 36 km of unwrapped steel, with a bined weight of 45,000 tonnes. The stadium will cost up to 3.5 billion yuan (422,873,850 USD/ 325,395,593 EUR). The ground was broken in December 2003, and construction started in March 2004, but was halted by the high construction cost in August 2004. In the new design, the roof of the stadium had been omitted from the design. Experts say that this will make the stadium safer, whilst reducing construction costs. The construction of the Olympic buildings will continue once again in the beginning of 2005. 水立方 With the year of 2007 approaching, good news came from the construction sites of the Olympic p......>> 问题八:鸟巢和水立方的英文怎么说? National Aquatic Center 水立方 Beijing National Stadium (Bird's Nest/Olympic Stadium)鸟巢 问题九:鸟巢英文怎么读 nest 英[nest] 美[n?st] 可百度翻译上听发音fanyi.baidu/?aldtype=85#en/zh/nest 问题十:水立方和鸟巢用英语怎么说 鸟巢:Bird's Nest 水立方:Water Cube 这是形象的说法。按体育馆翻译分别是 国家体育场:National Stadium 国家游泳中心:National Aquatics Center
优质英语培训问答知识库