朝天辣椒smile
参观的英文是:visit
读音:英 ['vɪzɪt] 美 ['vɪzɪt]
v. 拜访;参观;闲谈
n. 拜访;参观;聊天
词汇搭配:
1、visit the factory 参观这家工厂
2、visit customarily 例行公事地视察
3、visit largely 参观的人很多
4、visit regularly 定期巡查
常见句型:
1、When he was on a visit to Beijing, he went to visit the Great Wall.
他在北京访问期间去参观了长城。
2、It is really a place worthy of a visit.
这真是一个值得参观的地方。
3、If it doesn't rain tomorrow, we will visit the Great Wall.
如果明天不下雨的话,我们将参观长城。
4、If it rains tomorrow, we will have to put off the visit to the Summer Palace.
万一明天下雨的话,我们将不得不推迟参观颐和园。
1、词源解说
13世纪初期进入英语,直接源自古法语的visiter;最初源自古典拉丁语的visitare,意为看,检查。
2、词语用法
visit用作名词的意思是“来或去见某人或到某处访问”“参观”“游览”“逗留”。在口语中还可指“聊天,谈话”。
visit的基本意思是“访问某人或某地”,即“访问”“探望”“参观”“视察”“逗留”“出诊”,指因为礼节、友谊、生意或职责的需要而来到某人处并短时间地与其呆在一起。
visit既可用作不及物动词,也可用作及物动词。用作及物动词时,接名词、代词作宾语。可用于被动结构。
3、词义辨析:
call on,visit,drop in这些动词或词组均含有“拜访,访问”之意。
call on社交上的正式用语,指无目的、礼节性的短暂拜访,访问者与被访问者之间一般只有社交或公务关系。
visit正式用词,强调出于工作需要的访问,也指亲戚朋友间的看望。
drop in多指在计划之外或事先未打招呼的偶然、顺便访问。也可指参观。
蛋爹是石头
This way, please take the stairs (up elevator), I am sorry, 6 floor, our floor is antistatic brush paint, and also do NOT, therefore temporarily unable to look into and can only glance at the elevator lobby, I will perhaps tell us here condition, 6 floor, paint manufacturing department are, at present we can see a Automatic paint line has been set up, he included a pre-treatment line and an automated paint line ~ in the paint lines are printed diagonally opposite side of room, there will be a pad printer, screen printing ovens Units One and Three Units Units ~ paint line has approximately 62 staff ~
魔戒之love
哪边有英语提示..?I went to a factory with my classmates last month. That day the weather was very fine and I was in a good mood. In that factory, we saw ceramics, paintings, some traditional clothes and so on. The factory was established in 19xx. Now it is very famous.With a collection of over 120,000 cultural relics, it is the one of the most famous factories in the world. I think it’s a very exciting place.I think it’s a very good education. If you only have time for one factory, make sure it is this one. I believe that you can enjoy yourself in this factory.
烧仙草AO
The customer must arrive our factory visit, I must introduce, asks the person of high skill to help the translation English, the little brother urgently needs the commentary: Welcome fellow distinguished guests to visit the machine shop, our new building occupying a land area of 20000 squares, are completed in December, 2008, at present is being under construction and installs debugs the equipment, estimated will complete in the end of the month, mid-April the inputs will produce, estimated will produce can be 35K each month. Was sorry very much at present cannot let everybody see to a complete production condition, we can explain and the scene union way, lets you as far as possible many understanding organization factory ~ if in the visit process, you has any question, may although proposed, we can have the personnel to do for you explain ~ The organization factory probably has about the staff 300 people, at present this building 1,2,5,6 and produces the location for ours work, now we are at a building, is the ramming manufacture department, is responsible for NCT, the ramming manufacture.The ramming manufacture department staff probably has 82 human of ~ please here to walk, here has three NCT equipment (numerical control machine), two Taiwan calendar Pu and a Amada.NCT numerical control engine bed has the efficiency to be high, accuracy high and processing convenient characteristic.It the formula which makes through the analysis blueprint inputs the control bench to send out the command control different drift impact plate to achieve the different ramming effect, has flushes mesh, nibbles, the cutting edge angle and so on many kinds of processing way ~ in the factory NCT equipment may process many kinds of plates at present, thickness request is.Our multipurpose NCT pulls the product or produces some small batches product ~ works as us Please here walk, here is the mold depositing area, uses for to deposit us to produce the aircraft type the mold, at present has pould frame 16, probably may deposit set of mold ~ Here is the ramming 1 area and 2 areas, altogether has 45 tons, 60 tons, 80 tons, 110 tons, 160 ton and 200 ton different tonnage punch presses 37 and 60 ton continual punch presses. Some quantity quite stable aircraft type, can consider likely uses the die stamping the way to produce ~ Here is the ramming 3 areas, was introducing a moment ago NCT or mold ramming processing from now on plate, we will be able to continue to process, for instance: Hits the rivet, pulls out attacks the tooth and so on, can use here the equipment, at present in the factory has pulls out hole machine 3, attacks tooth machine 4, rivet machine 1 ~ processes after these working procedures, we can to the plate carry on the knee bend, at present in the factory has booklet bed 10. In if the engine case has the part which the need unifies or on the one hand and on the other hand union, can use the spot welding, at present in factory a little welding machine 14. (Because in spot welding time temperature is high, water tank is carries on radiation to machine equipment) OK, this is building ramming manufacture department condition ~ Please here step onto the staircase, 2 buildings are organization factory host office district, can have including RD, ME, PMC, MPM, QE and so on about 35 people in here work ~ OK, please here walk the staircase (on elevator), 4 buildings and 5 buildings at present vacant, but also has not planned use ~ Good, we arrived 5 buildings, here is assembles the manufacture department, can establish 3 groups to install wiring in here, that side another half region assembles the material classification storage area, can lay aside the line material, the hardware, the revertex class material, the organization components and Bao Cai~ assembles the manufacture department to be able to have about the staff 53 people, at present also in construction stage, therefore we only can see has a group to install wiring in here, asks the excuse me ~ group to install wiring mainly is can assemble some independent engine cases, in the process can have in view of the power source, the line material, the ventilator peaceful gauge test and the function tests ~ for instance to look at the ventilatorWhether normal work, power source voltage electric current test and so on ~ Please here step onto the staircase (on elevator), was sorry very much, our 6 building floors are brushing guard against the static electricity paint, has not done, therefore is unable to look temporarily, only can glance over in the elevator mouth, I can probably introduce here condition, 6 buildings are the baking varnish manufactures department, at present everybody may see roasted the paint line to one already to erect automatically finished, he contained in front of one to process the line and automatically roasts paint line ~ in to roast the paint line that side the diagonally opposite prints the room, could have moves copier, oven roasts the paint line with silk ink pad three ~ to have probably 62Staff ~ The baking varnish met the past to process starts, after high-quality goods, could start the autocycle production from that side, carried on the pre-degreasing, the clear laundering, the epithelium, the table adjusted and so on the pretage working procedure, after in order to clean up machine component surface greasy dirt ~ then process drying, then passed through the automatic spraying system, carried on the static electricity spraying and the automatic spray point (spray point is in order to reduce not good or nips flowered request), after then the roasting, carried on the quality testing, not good has not acted according to requests to carry on superficial printing (silk India or moves India), again baked above ~ is baking varnish basic flow ~ To this, to the machine shop the introduction basic conclusion, thanks everybody participation ~ thanks the distinguished guests arrives visits, has the deficiency, please propose, thanks ~
优质英语培训问答知识库