• 回答数

    6

  • 浏览数

    157

火焰天堂
首页 > 英语培训 > 电气设计英语

6个回答 默认排序
  • 默认排序
  • 按时间排序

初夏红豆冰

已采纳

我昨天帮一个翻译了论文摘要, 翻译完了,TMD还说这不对,那不对。 GG翻译专业,专业八级都过了。 再也不详在做这费时不讨好的事情了。

电气设计英语

159 评论(15)

dapangduola

The design of a Tianjin chemical fiber textile factory power supply systemAbstractThis design aims to through to Tianjin, a chemical fiber textile factory for distribution system design allows designers to understand the design process of the power supply system of industrial enterprises and basic skills, in the design process not only to deepen the understanding of power supply and distribution of the technology, training of theoretical knowledge of flexible application ability. Design process including: load calculation, scheme demonstration, short circuit calculation, equipment selection, reactive power compensation and the distribution of the design etc.. The sewage treatment plant for secondary load, two power supply into line, plant a total of two step-down substation (35KV/10KV). 10KV/0.4KV).Because of the power supply power factor greater than 0.9, so the compensation in low voltage side capacitor to meet requirements of. The current through the load calculation andthe calculation of the short-circuit point selection of equipment, so as to meet therequirements. In the design process of the safety and reliability of power supply system are fully considered, and strive to make the economy reasonable.Suzhou R & D center building electrical designAbstractThe design for the electrical design of a Suzhou R & D center building. Electrical design follow the civil architectural electrical design code (jgj16-2008), and in accordance with the current national standard and standard. According to the size and functional demand of construction, query specification, the building belongs to the high-rise civil buildings, building category for a class of construction, the fire resistance rating for a level, the lightning protection level for secondary and general lighting with three load power supply, fire power and the important load with a load power supply, the connection of the low voltage distribution system TN-C-S.Lightning protection system design using lightning protection network.The building electrical design includes two parts: the design of power system and the weak system design. These include high voltage low voltage power distribution design, lighting system design, lightning protection and grounding system design; weak part including fire protection system design and cable TV system design, design of a telephone system, network system design, security system design. Design should be according to the construction scale, the use requirement and design principle, calculated according to the technical specifications, and wire and the equipment selection, so as to meet the economic rationality and energy conservation requirements, ensure the power supply reliability.

320 评论(11)

snake20001981

电子工程师;简单说就是弱点。包括所有的电子产品。(交换机,通讯管理机)电气工程师:简单说是低压高压。包括所有的电器产品。(断路器、接触器等。)

239 评论(14)

可怜的tina

为您解答如下:天津某化纤毛纺厂供电系统设计 摘 要 本设计旨在通过对天津某化纤毛纺厂供配电系统的设计使设计者了解掌握工业企业供电系统的设计过程及其基本技能,在设计过程中不但加深了对供配电这门技术的理解,还培养了对理论知识灵活应用能力。设计过程包括:负荷计算、方案论证、短路计算、设备选择、无功补偿及变配电所的设计等。此污水处理厂为二级负荷,有两路电源进线,厂区内共设两个降压变电所(35KV/10KV).(10KV/0.4KV)。因供电电源要求功率因数大于0.9,因此通过在低压侧加电容进行补偿使之达到要求。通过负荷计算和对各短路点的电流计算选择设备,使之满足要求。在设计过程中充分考虑了供电系统的可靠性与安全性,并力求使之经济合理。关键词:变电所;变压器;负荷计算;短路计算;照度计算;功率补偿苏州某研发中心大楼电气设计摘 要 本设计为苏州某研发中心大楼的电气设计。电气设计遵循《民用建筑电气设计规范》(JGJ16-2008),并符合国家现行的其他规范和标准。根据建筑的规模大小和功能需求,查询规范知,该建筑属于高层民用建筑,建筑类别为一类建筑,耐火等级为一级,防雷等级为二级,一般照明采用三级负荷供电,消防用电和重要负荷采用一级负荷供电,低压配电系统的接线方式采用TN-C-S。防雷系统设计采用避雷网。该建筑电气设计包括两部分:强电系统设计和弱电系统设计。其中强电部分包括低压配电设计、照明系统设计、防雷与接地系统设计;弱电部分包括消防系统设计、有线电视系统设计、电话系统设计、网络系统设计、安防系统设计。设计中要根据建筑的规模、使用要求及设计原则,计算得出相应的技术指标,并进行导线及设备的选型,使之满足经济合理性及节能要求,保证供电的可靠性。关键词:低压配电;照明;消防;防雷与接地Tianjin a certain chemical fiber woolen mill power supply system design Pick to This design aims to through the design of a certain chemical fiber woolen mill power supply system in tianjin to designers to grasp the design process of industrial enterprise power supply system and its basic skills, in the design process not only deepened the understanding of power supply this technology, and train the ability of the flexible application of theoretical knowledge. The design process include: load calculation, short circuit calculation, equipment selection, project demonstration, reactive power compensation and distribution design, etc. The sewage treatment plant as the secondary load, there are two way power supply into line, the factory have two step-down substation (35 KV / 10 KV). (10 KV / 0.4 KV). Because of the power supply for power factor more than 0.9, so through in low voltage side capacitance compensation to meet the requirements. Through load calculation and selection for the current calculation of short-circuit point equipment, to meet the requirements. In the design process fully consider the security and reliability of power supply system, and strive to make economic sense. Key words: substation; Transformer; Load calculation; Short circuit calculation. Intensity of illumination computation; Power compensation A research and development center building electrical design in suzhou Pick to This design for a research and development center building electrical design in suzhou. Electrical design follow the civil construction electrical design specification (JGJ16-2008), and other specifications and conform to the current national standards. According to the scale of construction and the function demand, query, the building belongs to the high-rise civil buildings, category for a class of buildings, fire resistance rating for level 1, level of lightning protection for the secondary, general lighting use level 3 load power supply, fire power and important load using level load power supply, the connection mode of low-voltage distribution system adopts TN - C - S. With lightning protection network in lightning protection system design. The building electrical design includes two parts: the high voltage system design and the weak current system design. High-voltage electrical parts including low-voltage distribution design, lighting system design, lightning protection and grounding system design; Elv part includes the fire protection system design, cable television system design, telephone system, network system design, security system design. Design according to the size of the building, use requirement and design principles, calculation of the technical indicators, and wire and equipment type selection, make it meet the requirements of economic rationality and energy conservation, to ensure the reliability of power supply. Key words: low-voltage distribution; Lighting; The fire; Lightning protection and grounding . -----------------------------------如有疑问欢迎追问!满意请点击右上方【选为满意回答】按钮

141 评论(15)

无形风9596

Along with the our country economic development rapid development, the lives of the people level unceasing enhancement, the city uses to be day by day anxious, urges the building to face the direction is developing. This kind of high level civil construction repair needed materials and the way also more hasten the diversification, and along with uses electricity the load and coal gas consumption quantity enlarging, proposed to the fire auto-alarm system design is higher, a stricter request. In order to guarantee the people life and property the security, the fire auto-alarm system design has become in the high level civil construction design one of most important design contents. Presently based on the author fire of auto-alarm system design overseeing work in the high level civil building experience, proposed in present national related standard and standard unclear true detail shallow opinion, by for the colleagues to discuss and to point out mistakes.First, design basis The fire auto-alarm system design is a specialized very strong technology work, at the same time also has the very strong policy-type. Therefore, first should be clear about the following design basis: 1st, must grasp the architectural design fire protection standard, the system design standard, the equipment manufacture standard, the installment construction approval standard and the administration laws and regulations and so on five big aspects fire laws and regulations, and in practical understanding present country related standard and standard positive word: "Must", "be supposed", "to be suitable", "may" and the reverse side word: "Strictly prohibits", "should not", "not have", "not to be suitable" the meaning.2nd, must aim at high level civil building function, use and the protection object fire protection rank, earnestly carries out the present national related standard and the standard, earnestly treats the public security fire prevention surveillance department the examination and approval opinion.Second, fire auto-alarm system equipment establishmentFire detector establishmentOpens wide either the seal or the stair hall should alone divide the search coverage, and each 2 ~ 3 establish a fire detector.The first room (including guards against in front of smoke stair hall in front of room, fire elevator room, fire elevator with guards against the front room which smoke stair hall comes in handy) and the aisle should distinguish alone to divide the search coverage, specially front the room and the lift well, the scattered stair hall and the aisle are interlinked, has time the fire haze to be easier to gather or to flow, is the personnel disperses which saves goal with the fire prevention, therefore should install the fire detector. Regarding common elevator in front of room although is not the personnel disperses , but this front room and the lift well are interlinked, has time the fire haze to be also easy to gather or to flow, suitably alone divides the search coverage and installs the fire detector. The electric cable shaft therefore is easy to form pulls out the smoke inflammation the channel; Has when the fire the fire intensity not easily extends along the electric cable burns, for this, "the high level civil construction design fire protection standard" and "the civil construction electricity design standard" separately proposes the detailed specific stipulation in the construction and in the electric wire or on the electric cable shaping. But considered implements specifically the difficulty and the present situation, the electric cable shaft installs the fire detector is extremely essential, and coordinates the shaft the fire protection separation request, each 2 ~ 3 or each level installs.The elevator machine room should install the fire detector, its elevator is the important vertical transportation vehicle; Its two elevator machine room has has the fire risk; Its three lift well existence essential opens the hole, like the level gate opens between the hole, the air vent, the between permanence opens the hole with the elevator machine room or the pulley and so on; Its four when has the fire, the lift well often becomes the fire intensity spread the channel, is easy to threaten the elevator machine room the facility. Therefore, the elevator machine room establishes the fire detector is necessary, crown of also suitable establishment fire detector lift well.2nd, the manual fire reports to the police the button establishment(Including guards against in front of smoke stair hall in view of various floors front room in front of room, fire elevator room, fire elevator with guards against which smoke stair hall to come in handy the front room) is has when the fire the personnel to disperse which saves goal with fire prevention, should report to the police the button first choice spot as the establishment manual fire. In addition, the room also should establish the manual fire to the common elevator in front of to report to the police the button.In the public active place (including hall, hall, dining room, multi-purpose hall and so on) and the main thoroughfare and so on place, the personnel very is all centralized, and mainly disperses the channel. Therefore should report to the police the button in these public active places main access establishment manual fires; The manual fire establishes which in the main thoroughfare reports to the police the button to guarantee "to a manual fire which most is close to reports to the police the button distance from a fire protection district any position not to be supposed to be bigger than 30 meters".3rd, the fire emergency broadcasts the speaker the establishmentThe aisle, the hall, the dining room and so on the public place personnel very are all centralized, and mainly disperses the channel. Therefore should press in these public places "to a recent speaker distance is not bigger than 25 meters from a fire protection district any spot" and "in the aisle last should not be bigger than 12.5 meters the speaker to the aisle terminal distance" the establishment fire emergency to broadcast the speaker; Next also should establish the fire in the public bathroom place emergency to broadcast the speaker.The first room (including guards against in front of smoke stair hall in front of room, fire elevator room, fire elevator with guards against which smoke stair hall to come in handy the front room) is has when the fire the personnel to disperse which saves goal with fire prevention, also has the fire door separation and the sounds of people is confused and noisy, therefore should establish the fire emergency to broadcast the speaker. In front of the common elevator the room also should establish the fire emergency to broadcast the speaker. Disperses the stair hall also is has when the fire the personnel to disperse which saves goal with the fire prevention, also the sounds of people are confused and noisy, therefore should establish the fire emergency to broadcast the speaker, by favors the fire emergency broadcast to disperse the instruction.4th, fire alarm installment establishmentThe establishment fire emergency broadcast fire auto-alarm system, the author thought also should install the fire alarm installment, but its control procedure should be: The alarm apparatus should confirm after the fire, uses manual or the automatic control mode unification to the fire correlation region transmission warning, stops the alarm apparatus work in the stipulation time, the rapid linkage fire emergency broadcast and broadcasts to the people disperses the instruction.The fire alarm installment establishment position, the author thought should report to the police the button position with the manual fire to be same, its wall surface installment should for be apart from the ground 1.8 meters highly5th, fire special use telephone establishmentInstalls the fire special use telephone extension telephone, should be located the engine room which related also some people is on duty frequently with the fire linkage control (including fire water plant, spare electricity generation engine room, matches substation, mainly ventilates with air conditioning engine room, discharges fume engine room, fire prevention elevator machine room and other), the fire fighting control system operates the equipment place or the control room, the fire duty officers observation room, the security manages spot and so on public room. Sedan of theater box the fire elevator and in the ordinary elevator all should suppose the special use telephone, requests the elevator machine room and the elevator sedan theater box, the elevator machine room and the fire control room, the elevator sedan theater box and the fire control room and so on three compositions is reliable to speaks the correspondence telephone system. Usually in fire control room; The establishment elevator monitoring demonstration plate (including position indicator, direction indicating lamp, to speaks correspondence telephone, trouble lamp and so on), in order to carries on the necessity to the elevator running status which in the surveillance and the emergency case controls.Is equipped with the manual fire to report to the police position and so on button, fire hydrant button also should install the fire special use telephone receptacle.Third, fire linkage control 1st, the fire linkage control should include the control fire pump to open, to stop, also should demonstrate opens pumps the button the position and the fire pump work and the malfunction. When the fire hydrant is equipped with the fire hydrant button, its electric installation work spot also should demonstrate the fire pump the working mode active status (namely establishment fire pump work indicating lamp). 2nd, the fire linkage control should include the control spraying of water and the water atomization fire fighting system opens, stops, also should demonstrate the fire pump the work and the malfunction and the fluent display, reports to the police the valve, the safety signal valve working mode active status. In addition, to the basin, the water tank water level also should carry on the demonstration monitor; In order to prevent the overhaul signal valve is shut down, the author thought should use the belt electric signal the control signal valve by to demonstrate it opens the condition. 3rd, the fire linkage control other controls and the demonstration function, should carry out the present national related standard and the standard specific stipulation.Fourth, fire auto-alarm system wiringIn order to prevent the fire occurs when the fire control, the correspondence and the warning line severance, causes the fire fighting work to be unable to carry on, creates the bigger economic loss; Also for the suppression electronmagetic interference (for example transformer, electric motor, electric cable and so on) the influence which produces to the fire auto-alarm system. The fire auto-alarm system transmission line and the fire control, the correspondence and the warning line should use the being flame-resistant electric cable, and should use the metal tube or the enclosed metal trunking protection. The fire manual positive governing installment line should use the fireproof electric cable, its electric cable also should use the metal tube or the enclosed metal trunking protection. Uses Ming Fushi, should takes the fire protection protective measures on the metal tube or the enclosed metal trunking.Fifth, concluding remarkThe author rests on the concrete project to implement the experience, elaborated the design basis, fire auto-alarm design actual problem and so on system equipment establishment, fire linkage control and its wiring pulls out some shallow opinions, its goal is enhances the fire auto-alarm system the design quality, discovered early and the notification fire, prevented and reduces the fire to harm, by protects the person and the property safety.随着我国经济发展快速发展,人民生活的水平不断提高,城市使用是每天着急,敦促建设面临着发展的方向。这种高层次的民间建筑维修所需的材料和方式也更加多样化加快,而且随着使用电力负荷和煤气消费量扩大,提议消防自动报警系统设计较高,更严格的要求。为了保证人民生命和财产的安全,消防自动报警系统的设计已经成为在高级别民间建筑设计的一个最重要的设计内容。目前的基础上撰文火灾自动报警系统设计监督工作的高层次的民间建设的经验,建议在目前国家相关标准和标准不清楚真正详细浅见解,为同事们的讨论,并指出错误。 首先,设计依据 火灾自动报警系统的设计是一家专业非常强的技术工作,同时还具有很强的政策性。因此,首先应明确以下设计依据: 第一,必须紧紧抓住的建筑设计防火标准,该系统的设计标准,标准的设备制造,安装施工审批标准和管理的法律和规章等五大方面的消防法律法规,并在实际了解国家有关本标准和标准积极字: “必须” , “必须假定” , “不适合” , “可能”和反面词: “严格禁止” , “不应该” , “没有” , “不适合“的含义。 第二,必须着眼于高层次的民间建筑的功能,利用和保护对象的防火等级,认真开展本标准和国家有关标准,认真对待公安防火监督部门的审批意见。 其次,火灾自动报警系统设备的建立 建立火灾探测器 要么全打开的印章或楼梯大厅应单独划分搜索范围,每个2 〜 3建立火灾探测器。 第一个房间(包括防前面的烟雾大厅楼梯前室,消防电梯间,消防电梯防前面房间烟雾楼梯大会堂来用场)和过道应区分单独划分搜索范围,特别是前面的房间,以及电梯,分散楼梯大厅和走道都是相互关联的,有时间的火灾烟雾比较容易收集或流动,是人员分散保存目标与防火,因此,应该安装火警探测器。关于共同电梯前室虽然不是人员分散,而且这方面的空间和良好的电梯是相互关联的,有时间的火灾烟雾也很容易被收集或流动,适当地划分为单独的搜索覆盖面和安装消防探测器。 电缆轴因此很容易形成掏出烟炎症渠道,拥有火灾时的火强度不容易延伸沿电缆燃烧,为此, “高级别民间建筑设计防火标准”和“民用建筑电气设计标准“分别提出了详细具体的规定,在建筑和在电线或电缆塑造。但认为具体实施的难度和目前的情况下,电缆竖井安装了火灾探测器是非常必要的,坐标轴的防火分隔要求,每2 〜 3或每一级安装。 电梯机房应安装火灾探测器,它的电梯是重要的垂直交通工具,其两个电梯机房已具有火灾危险性,其存在的三个基本解除以及打开洞,像打开闸门的水平之间的球洞,在气孔,持久的关系打开了洞与电梯机房或滑轮等,其时,有四个火,升降机以及往往成为火灾强度传播渠道,很容易危及电梯机房设施。因此,电梯机房建立了火灾探测器是必要的,也适用于皇冠建立火灾探测器举井。 2 ,手动火警报警按钮建立 (包括防前面的烟雾楼梯大厅鉴于各层前房间前面的房间,消防电梯间,消防电梯防这些烟雾楼梯大会堂派上用场前室)是有火灾时人员驱散节省目标,防火,应立即向警方举报的按钮,首选地点设立手动火警。此外,该室也应建立防火手册的共同电梯前,向警方报案的按钮。 在公共活动场所(包括会堂,礼堂,餐厅,多功能厅等)和主要通道等场所,是所有工作人员非常集中,主要是分散的渠道。因此,应立即向警方举报的按钮,在这些公共活动场所主要通道设立手册火灾;该手册规定的火灾中的主要通道报警按钮,以保证“ ,以手动火警最接近报警按钮距离防火区的任何位置不应该超过30米。 “ 第三,消防紧急广播喇叭建立 走道,大厅,餐厅等公共场所的工作人员都非常集中,主要是分散的渠道。因此,应该按这些公共场所的“最近的一项发言距离不超过25米的防火保护区的任何位置”和“在走道上不应大于十二点五米扬声器的过道末端距离”建立消防应急广播喇叭;下一步还应当建立消防在公共浴室的地方紧急广播喇叭。 第一个房间(包括防前面的烟雾大厅楼梯前室,消防电梯间,消防电梯防这些烟雾楼梯大会堂派上用场前室)是有火灾时的人员驱散节省目标与防火,也有分离和防火门的声音,人民的混乱和嘈杂,因此,应建立消防应急广播喇叭。在前面的共同电梯房也应建立消防应急广播喇叭。分散大厅楼梯也已经火灾时的人员驱散节省目标与防火,也是人民的声音和嘈杂的混淆,因此应建立消防应急广播喇叭,由主张消防紧急广播驱散指令。 第四,建立火灾报警装置 建立消防应急广播火灾自动报警系统,笔者认为还应该安装消防报警装置,但它的控制程序应该是:该报警器应确认火灾后,利用手动或自动控制模式统一消防相关区域传输预警,报警器停止工作时间的规定,迅速联系消防应急广播和电视节目,并且分散了人们的指示。 火警警报装置建立的立场,笔者认为应该向警方报案的按钮位置的手动火警是相同的,它的墙面安装应为距地面1.8米高度 第五,消防专用电话设立 安装消防专用电话分机电话,应设机房其中也涉及一些人是在工作地点经常与消防联动控制(包括消防给水设备,备件发电机房,火柴变电站,主要ventilates空调引擎室,排放烟气轮机室,防火电梯机房及其他) ,消防控制系统的经营场所或设备的控制室,消防责任人员观察室,现场的安全管理等公共空间。轿车的影院中消防电梯和普通电梯应假设所有使用的特殊电话,请电梯机房和电梯轿车影院中,电梯机房及消防控制室,电梯轿车影院方块和消防控制室等三个成分是可靠的讲通信电话系统。通常在消防控制室;建立电梯监测演示板(包括位置指示器,显示方向灯,以讲信函电话,麻烦灯等) ,以进行必要的电梯在运行状态的监视和紧急情况下的控制。 配备了手动火警报警位置等按钮,消火栓按钮,还应该安装消防专用电话插座。 第三,消防联动控制 第一,消防联动控制应包括控制消防泵开启,停止,也应表现出的按钮,打开泵的位置和消防泵的工作和故障。当消火栓设有消火栓按钮时,其电气安装工程现场也应表现出的消防泵的工作模式有效状态(即建立消防泵工作表明灯) 。 第二,消防联动控制应包括控制喷洒水和水雾化灭火系统打开,停止,也应表现出的消防泵的工作和故障和流利显示,报警阀,安全信号阀工作模式积极的地位。此外,该盆地,水箱水位也应进行示范监测;为了防止检修信号阀关闭,作者认为应该使用带电信号控制信号阀证明它打开条件。 第三,消防联动控制其他控制和示范作用,应进行本标准和国家有关标准的具体规定。 第四,火灾自动报警系统布线 为了防止火灾发生时,消防控制,通信和警戒线遣散,使灭火工作无法进行,造成了更大的经济损失,也为抑制electronmagetic干扰(例如变压器,电电机,电缆等)的影响而产生的火灾自动报警系统。火灾自动报警系统的输电线路和消防控制,通信和预警线应使用被阻燃电缆,并应使用金属管或封闭式金属线槽保护。消防手册积极理事分期付款行应使用防火电缆,其电缆也应使用金属管或封闭式金属线槽保护。使用明复,应采取防火保护措施的金属管或封闭金属trunking.Fifth ,结论备注 作者取决于具体的项目实施经验,阐述了设计依据,火灾自动报警设计和实际问题,以便建立系统设备,消防联动控制及其接线拿出一些肤浅的意见,其目的是增强了火灾自动报警系统的设计质量,早期发现,并通知消防,预防和减少火灾危害,通过保护个人和财产安全。

252 评论(12)

啃鲍鱼的螺丝

花点钱找个翻译公司吧。百度上很难找到有专业背景的,翻译的东西没法用,都是让歪果仁翻白眼儿的译文。

173 评论(11)

相关问答