蛋蛋徐要发疯
污水处理厂一般流程The general procedures for the waste water treatments.污水经过格栅进入初沉池,再进入生物反应池,在进入二沉池,The waste water is allowed to go through the filtering grids to the preliminary sedimentation pool, and then to the biological reaction pool, and again into the secondary sedimentation pool.
宝宝囡囡
Sewage treatment:According to different levels, sewage sludge sewage treatment can be divided into secondary and tertiary treatment,. Primary treatment basically is in a suspension of solid waste, mainly by the interception and settlement, oil physical method. Second is the main task for the treatment of wastewater is greatly removed the colloid and dissolved organic pollutants, use the method of activated sludge, the biological treatment membrane. 3 processing and depth, its purpose is to remove the suspended, inorganic wastewater and other pollutants, the commonly used method is mainly physical and chemical methods, such as the technology adsorption, ion exchange and coagulation precipitate, oxidation, etc.Urban sewage by grid, a leaking (tank), remove the suspended and gravel, large and aeration biological treatment into second leaking (second pond) spate separation, separated from the sludge sedimentation of back into aeration, another part of the concentration, the digestion and dehydration after the comprehensive utilization of shipped, 2 the leaking water via chlorination pool after disinfection in-depth processing or discharge.Water treatment:The basic principle of water -- > add alum, settling -- > > -- -- - and chlorineFirst choose suitable water pipes and pipe, use water pump and pump (1) and before the pump to kill alga, chlorination plants and shellfish. Through the level of water pump to plant processing system. After mixing (usually in source water addition of suitable amount of aluminium, commonly known as "), precipitation, filtration, disinfection process, each process with the corresponding structures (such as filters, QingShuiChi leaking, etc), after disinfection is generally chlorination and ammonia, putting the disinfectant QingShuiChi, and by the water in the pool for an hour or so, the water qualified secondary pump water pump (by) pressure to urban network for drinking and production.
yannychan108
Chao Bai Huan Bao Shui Chu Li 为您解答,污水经过格栅进行初级过滤后,进入化粪池或隔油池(初级沉淀),经过初级沉淀的水进入一体化污水处理设备进行生物反应,这时的水已经可以达到排放标准,可直接排入市政管网。如果您无法连接到市政管网,还需要进行下一步的深度处理,经过深度处理后的水可以达到回用标准,可以用来绿化、冲厕、洗车等非饮用用途。
美丽先生的店
Suiyang Water Plant --capacity 2000T/d, takes the reservoir as its water source. The pipeline from the reservoir to the plant is long and costly, requiring a large-amount investment. Yanglongsi Water Plant—capacity 3000T/d, takes the groundwater as its source. Since the source water is of good quality, it only require simple processing treatment of filtration and disinfection to meet the standard for drinking water. Gaoping Sewage Treatment Plant—capacity 3000T/d, has a relatively smaller scale. It adopts the traditional Activated Sludge Method in primary clarifier and secondary clarifier and directly emits the clarified water when it meets the standard
老王弃治疗
啊呀,为什么没人“非免费”地帮你啊,那我免为其难的吧~呵呵-----------------------Suiyang Water Plant --capacity 2000T/d, takes the reservoir as its water source. The pipeline from the reservoir to the plant is long and costly, requiring a large-amount investment. Yanglongsi Water Plant—capacity 3000T/d, takes the groundwater as its source. Since the source water is of good quality, it only require simple processing treatment of filtration and disinfection to meet the standard for drinking water.Gaoping Sewage Treatment Plant—capacity 3000T/d, has a relatively smaller scale. It adopts the traditional Activated Sludge Method in primary clarifier and secondary clarifier and directly emits the clarified water when it meets the standard.
美丽华华
As the process starts, the waste water will go through the 格栅 to get to the 初沉池. and then it will go to the 反应池.。At the end it arrives at 二沉池 to finish the last step.
壹秒钟变rabbiT
The SuiYang water works 2000T/d, the water source is the reservoir water,the pipeline from the reservoir line more longer , the pipe network construction cost high, the disposable investment is bigger. Raises dragon department water works 3000T/d, the water source is the ground water, the water quality better, the processing craft is simple, only must filter, the disinfection may achieve the tap water water quality standard. Gaoping sewage treatment plant 3000T/d, the sewage treatment plant scale is smaller, uses traditional the active sludge law, passes through initially sinks the pond and two sinks pond two levels of processing, after the water quality reaches the sign directly to discharge.
优质英语培训问答知识库