• 回答数

    4

  • 浏览数

    163

panda熊猫陈
首页 > 英语培训 > 概要英语翻译

4个回答 默认排序
  • 默认排序
  • 按时间排序

好奇的小米

已采纳

摘要英文:abstract

abstract 读法  英 [ˈæbstrækt]  美 [ˈæbstrækt]

短语:

1、abstract in red and yellow 红黄相间的抽象画

2、abstract from a magazine 杂志摘要

3、abstract of a contract 合同的摘要

示例:

It might also be necessary to supply an abstract of the review of the literature as well.

可能也有必要提供这篇文学评论的摘要。

词语用法:

1、abstract用作名词时其意思有以下几点:一是“抽象概念”; 二是“抽象派艺术作品”,如抽象画、抽象雕塑、抽象设计等; 三是文献等的“摘要; 概要; 精粹; 梗概”,多指学术或法律方面比较艰深或复杂的文字摘要。

2、abstract常用于短语in the abstract中,意思是“就一般而言; 抽象地; 在理论上”, abstract前的定冠词the不可遗漏。

词义辨析:

abstract, digest, outline, summary这四个词都可表示“摘要”,即对已经流行的文字进行压缩的结果。其区别是:

1、从原始材料上说:summary和outline用于任何一篇文章; abstract用于一篇学术或法律方面比较艰深或复杂的文章; 而digest则用于来源不同的若干篇文章。

2、从含义上说:abstract强调简洁和实质性内容的集中; summary注重简练,而不刻意追求风格或事实、细节; outline侧重“要点”; 而digest则通常不仅要展示原作的精髓,也常常保留原作的语言和风格。

3、从形式上说:abstract, summary和digest都是一篇短文; 而outline则可以是一篇短文,也可以是一些编号或关键性词语。

4、从位置上说:abstract一般位于正文之前; summary和outline既可位于正文之前,也可独立成篇; digest则完全是另一篇文章。

概要英语翻译

156 评论(14)

蘑菇Miranda

译文:abstract

英['æbstrækt]

释义:

adj.纯理论的;抽象的;抽象派的

n.摘要;抽象;抽象的概念;抽象派艺术作品

v.摘要;提取;抽象化;退出;转移;使心不在焉

[复数:abstracts;第三人称单数:abstracts;现在分词:abstracting;过去式:abstracted;过去分词:abstracted;比较级:more abstract;最高级:most abstract]

短语:

abstract algebra[数]抽象代数;近世代数;[数]抽象代数学;代数结构

扩展资料:

词语辨析:summary,abstract,digest,outline,resume

这些名词均含“摘要、概要、概括”之意。

1、summary普通用词,指将书籍或文章等的内容,用寥寥数语作简明扼要的说明。

2、abstract指论文、书籍等正文前的内容摘要,尤指学术论文或法律文件的研究提要。

3、digest侧重对原文融汇贯通,重新谋篇布局,以简明扼要的语言,简短篇幅成文,展现原作精华。

4、outline指配以释议文字的提纲。

5、resume源于洁语,与summary极相近,通常可互换使用。

353 评论(14)

每天只睡4小时

Abstract :Sleeps west Huai high speed Huai An to exchange ties salt river bridge total length 577.04m. The bridge surmounts the Huaiyin area domestic salt river. The cross salty river bridge main span uses 80+140+80m three cross variable cross-section prestressed concrete continual box Liang. The approach span uses 30m completely constant section partial prestressed concrete combination box Liang, the bridge opening arrangement carries on the control according to bridge head depth of fill H=6.0m about. And toward sleeps west Huai high speed Huai An to exchange the direction approach span bridge span arrangement for 6×30m, a six association, after first simple support, continuously; After the Huai An urban district direction approach span is as soon as three unite the first simple support continuously partial prestressed concrete combination box Liang, the bridge span arrangement for 3×30m. Goes on stage the beginning, they proposed “by the first-class management, constructs the first-class project, unfolds the invincible army elegant demeanor” the slogan, established has improved the strict rules and regulations, drew up has guaranteed superior, argued vigorously the country superior quality objectives. They divide the entire project the construction earlier period preparatory work, drill hole pile soft base processing, the roadbed arch of bridge to construct three stages, carries on the refinement to each stage's duty, the project leadership labor division with individual responsibility, on-the-spot direction, the project department various administrative offices contract construction working party, the wage income and the constructional force completes the task, the security, the quality suspension hook, the responsibility to the human. Has only used 15 days, completed the entire line standard to be highest, equipment excellent test chamber, and first through Development organization's approval. 20 days completed the project department near to suppose the duty, one month has completed 11 kilometers access roads and 4 temporary bridge's construction works, took the lead to pull open the drill hole pile and the roadbed construction prologue in the entire line, in the Development organization organized in the construction earlier period preparatory work inspection obtained first, slept the Huai Highway Headquarters to hold on-the-spot meeting in this sign section, requested the entire line Construction to study to them. Key word: Prestressed concrete continual box Liang constructs earlier period preparatory work the drill hole pile soft base processing arch of bridge construction

317 评论(15)

zhuhuals2008

Since November 18, 2003, electronic competitive sports became the ninety-ninth State General Administration of sports (that was re defined as Seventy-eighth) officially since electronic athleticssports, Chinese has made great achievements in the world. But in the glossy appearance,occupation electronic sports club development path is not clear. In this paper, using the method of literature, comparative analysis and case analysis and other methods to our country occupationelectronic sports club management status of research, draw the conclusion, analysis and suggestions.

250 评论(10)

相关问答