杭州lili
Hardware spray processes: Workpiece polishing to make up for sub-Cement, polishing, spray cleaning, manual removal, automatic dust removal, paint spraying, cold flat, baking, the next thing to check (in addition to non-performing), automatic dust removal, paint spraying, baking, the next parts inspection and packaging. Various processes to be the time spent by the total length of line, managerial and technical strength of a constant, by a single operator, from the beginning to the end of the general process in two hours to make up for sub-Nai, when accounting for the maximum polished, calm and dry cold bake 6-12 m / min by 9-15 meters.
dongdongth
五金件喷漆的工艺流程:the flowchart of hardware painting 工件抛光: work piece polishing; 补坭子: badigeon/lacquer/putty/filler; 打磨: grinding; 喷淋清洁: cleaning; 手动除尘: manual dedusting; 自动除尘: auto dedusting; 喷底漆priming; 冷流平:cold-flow; 烘烤: drying; 下件检查(除不良): inspection; 喷面漆: finishing; 包装: packing.始到结束一般在两个小时以内,补坭子、打磨占时最长,冷流平和烘烤6-12米/分钟乘9-15米。Generally, it takes less than two hours, among that putty and grinding use longer period. The cold-flow and drying are 6-12 meters per minute and 9-15 meters per minute respectively.提问的朋友,你好。这是百度全体朋友为你的贡献。 谢谢前面第一位朋友的中文文字。 再有不清楚的地方或不足,可以继续提问。