In the way of measuring curve calculation process, involving many data, input and output of the work is trival. Here, we quote VISUAL FOXPRO 8.0 programming, reduces the trouble. VISUAL FOXPRO 8.0 with its unique structure, data processing data in table calculations, greatly improves the work efficiency.Deformation is a widespread phenomenon nature, various loads to the deformation, make its shape, size and location in time or space domain changes are deformation. Deformation monitoring objective is to obtain the deformation characteristics of time and space of state, and explain the reasons. Deformation Among them, the layout and the foundation pit excavation and the surrounding buildings in foundation pit construction stage, to ensure the in-situ construction safety is of great significance. The scheme has a variety of foundation excavation, various solutions has its advantages and limitations, and so, choose reasonable solution is to guarantee the quality of projects and foundation pit construction safety.Excel spreadsheet processing is powerful software is convenient and easy. It is mainly used for data processing, statistical analysis and calculation, is a powerful tool for data processing.Regression analysis is sure to two or more variables of the quantitative relationship between the interdependence of a statistical analysis method. This subject is based on three regression function correlation coefficient, high precision and selection of regression function return to predict pit deformation of the final.In the construction of foundation pit deformation monitoring work, play an important role. This subject mainly through excavation and the arrangement of monitoring data of regression analysis to determine the importance of deformation monitoring. And through the study, grasp the basic thoughts of regression analysis method, process and the forecast results are analyzed.Keywords curve, Deformation monitoring, Excavation engineering, Excavation, Subsidence monitoring, Regression analysis,

基坑支护英语

245 评论(12)

初见521125

Summary: Describes the building quality problems caused by construction, and more basic problems, more a series of problems caused by, any Foundation emerged defects or improper handling of the consequences will be very serious, made against the problem of modification and strengthening measuresKeywords: Foundation pit supporting of Foundation pit drainage of limit equilibrium State security reserve reinforcement of Foundation pit

112 评论(15)

鳗鳗小公主

Topic : Yantai Tianhong Times Square Excavations Design and Construction After the excavation of the pit to conduct the necessary support to the smooth construction of the project played a very important role. The project, a pair of earth pressure through the calculation of environmental studies to determine bolt increase pile supporting patterns. Construction process, not a lack of monitoring, on-site monitoring to detect possible danger signs, judgment of the security, to prevent damaged incidents, in order to take the necessary measures to the project; The results of the monitoring to the scene to guide the construction, information feedback optimization of the design, to make it possible to design high-quality, and safety. Yantai shallow groundwater, precipitation and also take other necessary measures to ensure that the construction process will not be gushing water. flow of sand and ground subsidence.

324 评论(9)

就爱装修

After structure excavation, carries on essential to the hole excavatedfor building foundation 支护, smoothly constructs to the projectcount for much making With. In this project, through to the earth pressure thecomputation, to the environment research, decided uses the anchor rodto add 排桩 支护 the way. In the construction process, monitorsessentially, the scene monitor is helpful to the prompt discoverypossibly has the dangerous omen, the judgement project security,prevents the project destruction accident the occurrence, in order totakes the essential project measure; Monitors the result instructs thescene construction, carries on the information feedback optimizationdesign, enables the design to achieve high quality, is safe. TheYantai area subsoil water level is shallower, but also must adopt theprecipitation and other essential measures guaranteed in theconstruction process cannot appear wells up the ground settlementwhich the water, the shifting sand and its causes.

185 评论(11)