yuqian1004
1. keep one’s word. 信守承诺
It is considered a good quality to keep
one’s word.
守信被认为是一种良好的品质。
2. keep one’s words 信守承诺,不加怀疑
First finish things in time , and keep your
words.
首先,按时完成任务,信守承诺。
北冰洋的海豚
Assurance of Equipment's Quality:1. Products that conform to design standard and acceptable quality level are to be supplied according to the contract's specifications.2. On the basis of the contract's stipulation, department of the ordering (requesting) party is to be provided with related standard and drawings, as well as accessibility and condition.Assurance of Delivery:1. To deliver according to the time and location as specified in the contract.2. Goods are to be delivered according to form of packing; the mode of transport as stipulated in the contract.Technical Assurance:1. To provide ordering party, in time, all technical information and drawings as stipulated in the contract. Supplier would carry out timely technical service on site when required, and to give ordering party guidance, on the basis of supplier's technical information and drawings, to carry out installation. 2. To meet ordering party's requirement on spare parts and tools at all time.Compensation on the Violation of Agreement:For any loss as a consequence of the violation of the agreement's stipulations, with respect to product quality and delivery, supplier would undertake to assume corresponding financial responsibility in accordance with the agreement's terms and conditions and related legal regulations.
小熊爱兔兔
Equipment Quality Commitment: 1, in accordance with contractual requirements in line with design standards, quality, qualified products 2, in accordance with the contract demand-side units to the relevant standards and drawings, and demand-side to facilitate and conditions. Delivery commitments: 1, according to the contractual place of delivery and time of delivery 2, according to contract requirements of the packaging and transportation methods to send the goods Technology Commitment: A timely manner to be stipulated in the contract provided by all the technical information and drawings. Necessary for the side will arrive on-site technical service and timely guidance for the demand-side by side to provide technical information and drawings for installation. 2, ready to meet the demand side of the spare parts requirements Breach of contract Compensation: As product quality and delivery requirements for breach of contract caused the loss of supply-side will, contract terms and provisions of relevant laws and bear the corresponding economic responsibility.
yissluckyg
Quality assurance agreementTo: XXXXX Limited Company In order to ensure to XXXXXX limited company's quality of products processing , the commitment to the following: 1, full use of environmentally friendly materials, customers designated raw materials brand, specifications without written consent cannot be changed; 2, the product must be carried 100% functions ( filling, discharge, flow, resistance, internal resistance, since consumption ) seized the entire shipment, as have other functions according to the specifications were detected; 100% visual inspection, protection board components without cold solder joint, false welding, welding and other welding half bad, components of each pin tin dipping degree ( height? The measure of area. Not less than 90%, metal, nickel plate IC, MOS≥ 3KG thrust test required. 3, the incoming inspection on the line after adverse rate ≤ 0.3%; 4, quality of abnormal timely treatment, to complete the scene control, I Division feedback problem never repeated; ( the problem of customer feedback to within 4 hours of an initial analysis and gives a temporary treatment plan, customer needs in 3 working days this effective 8D report ) 5, batch quality problem of zero; ( definition: the same phenomenon≥ 1%, causing XXXX has been receiving or marketing of the product batch rework, mass market recall ) 6, never appearing security quality problems, such as: short, fire, safety however, in contravention of the above; commitment to any one, I SECRETARY willing to bear all the losses ( including: material scrap / rework time / delivery delay punishment / indirect customers penalties etc ), and received additional ( RMB:1000 to 20000 yuan ) fine.