喵小萌103
liability有义务和赔偿的含义在里边,responsibility表示职责和责任。拓展资料duty, obligation, responsibility, function这些名词都有“义务”或“职责”之意。duty: 指按道德和法律的标准,一个人永远要尽的义务,强调自觉性。obligation: 指道义上或法律上对他人的义务,强调强制性。也指因作出承诺而被迫履行的某种义务。responsibility: 指任何义务、职责、责任或职务上所应尽的本分,强调对他人的责任。function: 指因职务或职业关系去履行某种职责。liability: liability n. 责任, 义务, 倾向, 债务, 负债, 与assets相对liability: the state of being legally responsible for something(things for which someone is responsibile, especially an amout of money owed)意思是需要对什么付法律责任,其中尤指还款赔偿.复数形式liabilities意为负债,债务例句:Tenants have legal liability for any damage they cause承租人造成的任何损坏都要付法律责任duty:1)a moral or legal obligation 2)a task or action that one is required to perform as part of ones's job第一个意思是道德或法律上的义务,责任,第二个意思是指你工作的职责义务例句:Martin's duties include cleaning the cars马丁的职责包括清洗汽车obligation:the condition of being morally or legally bound to do something意为道义或法律上的义务责任。具体区分法律或者道德角度的话还可以在前面加上形容词moral/lega;/social obligation 道德/法律/社会义务responsibility这个比较微妙第一个意思:a duty to be in charge of someone or something, so that you make decisions and can be blamed if something bad happens,意思是你的责任,但这方面的责任和上面那位说的有出入,注意到something bad happens,该你负的责,如果出了什么问题你是要背锅的。第二个意思是:blame for something bad that has happened(对不良事件)付的责任,意思是你得负责,因为事情搞砸了。例句: the managemennt accepts no responsibility for cars left in the car park管理部门对停车场停放的汽车不承担任何责任。如果你的车掉了,这是坏事,管理部门不负责(诸如不赔偿之类的)总结一下:liability主要指是你欠了钱,要还钱的义务 duty主要指是你的工作应尽的义务责任 obligation主要指法律或道义要求你的义务 responsibility是出了问题你要背锅的义务
西关少爷Billy
基层党建责任落实年the year to implement the responsibility of the grass-roots party construction
冰冷的火夫
1, according to shift duty engineer memories, 9 August 28, daily patrol, found in hot water tank of basement, after checking of water treatment equipment automatically find fault caused by water system. In the circumstances, failing to repair tank opened in automatic filling switching around will for artificial hydrating. In the morning after 11 when the water tank, inspect the basement level is 9 30CM has risen from normal level, but still 50CM,. And then again this afternoon, he found the basement has been touring 1.4 M deep water, soak in water, all the equipment running (for the memory stop, the hotel will please verify related technical personnel.2, the hotel received engineering manager on duty engineer reports to get around 1, after the hotel, and immediately notify hotel project contracting Shanghai construction and decoration Co., LTD, and emergency handling the hotel's request of architectural decoration Co., LTD with related equipment to send, and emergency assistance drainage pumping water pump to brother borrowed hotel. The accident happened on Saturday, when most engineering staff and equipment suppliers of technical staff rest at home. But part of the hotel, should rest at home after being notified of employees to work in hotel has arrived. Thus, support staff and related drainage device to arrive, drainage works, large pump operation, all four basic clear about chose basement water.3, glanf pump device, ambitious air-conditioner, hua sheng electronic KaiGuanChang, guangzhou pump factory technical personnel should request to hotels, restaurants for damage successively for repair or equipment repair work, and to assist in the maintenance of equipment manufacturer hotel active connections. The 22:50, damaged and pump all night, and remove to repair. KaiGuanChang hua sheng electronic engineer, to give rest to maintenance fittings factory, 29 to damage at 2 sets of distribution box on emergency repair, Pump repair employees to work overtime, 29 overnight at 3:30 completed need use 4 pump maintenance, installation and debugging of complete and.4, in grundfos engineer's help, 29, at 12:30 locker rooms and hot water. Employees recovery5 and 8 August 31 points, and the rest of the LiuTai pump repair, and installation. That night, on a high frequency pump installation, On September 1st at 9:30 points finish debugging operation. 2 at the high frequency converter is damaged, low in the factory maintenance of converter for all water soak in water, already cannot repair, waiting for the delivery.Based on the investigation and analysis of the accident, I think there are as follows:A scheduling department, the irrational, weekend arrangements that less attendant, repair work is met, operators to previously dealt with the fault equipment observation,Second, the hotel is a daily patrol system for the implementation of the regulations, also revealing going-over. But on the patrol duty engineer and staff and the quality of touring, lack of necessary monitoring method, daily patrol the quality and the effect to evaluate,Third, since restaurant area is too small, the nervous when necessary, design of electric equipment, water pump will be placed in the basement. However for heavy equipment running status monitoring shut by technical means, less, lack of automatic alarm system,In view of the above analysis, the hotel will take the following measures:A total package, tissue engineering, design, construction, equipment manufacturer to the hotel, the overall inspection equipment, eliminate unsafe,Second, according to the safety equipment, perfect solution, strengthening technical measures,Third, the reasonable adjustment, balance scheduling staff collocating, avoid weekends and holidays on-the-job personnel less occurs,Four, reiterated department division, strengthen the post responsibility consciousness; to implement the responsibility,Five, perfect equipment failure process, make more scientific and reasonable treatment,Six lines, even entire store staff on engineering education, improve the production safety of the employees work safety awareness and responsibility,In this accident, seven, to all the weight off equipment department, improve the comprehensive safety assessment safety measures and troubleshooting plan,The accident caused a great hotel, for the economic losses, the damage of equipment only reached 16 million direct losses caused by accident, the indirect loss is invaluable for the engineering manager, responsible for an unshirkable responsibility, therefore, request the hotel to sanction.