• 回答数

    4

  • 浏览数

    187

努力中的女人
首页 > 英语培训 > 规格书翻译成英文

4个回答 默认排序
  • 默认排序
  • 按时间排序

喵呜兔几

已采纳

本人英语系,为您翻译的,望采纳5.1 the owner'check5.1.1 the owner or the owner's representative shall have the right to check any or all of the work that the supplier according to the technical specification requirements do, and can come in and go out from suppliers's related working places(in normal working hours). 5.1.2 The supplier shall notify the owner in the contract within 14 days after signing the production plan, and notice to the owner before the start of any test at least 14 days, in order thatthe owner has time to arrange representatives to prove the tests in person. 5.1.3 the owner's representative check can not reduce any responsibility that the supplier shall bear. The supplier should provide the owner with all parts of the quality of the material certificate or quality inspection report.5.3 weld detection 5.3.1 fast-opening blind all the A and B class welding joint shall be subject to the provisions of the JB/T4730 for ray detection;If necessary you should undertake the ultrasound. Nondestructive testing and the proportion of the qualified level shall conform to the provisions of the relevant codes and standards. 5.3.2 all the nondestructive testing should follow the JB/T4730 or the provisions of ASME Ⅸ requirements, and in accordance with the provisions of the welding process procedures. Weld quality acceptance standard according to the GB150.1 ~ 150.4 "pressure vessel" on the class A and class B joint regulation, X ray 100% inspection level II qualification, ultrasonic 100% inspection level I qualified.5.3.3 nondestructive testing operation and analysis should be done by a qualified technical personnel. 5.3.4 bearing parts shall be test with flange, screw, nut magnetic particles, and make sure no crack for qualified. Each fast-opening blind should be on hydraulic pressure test after manufacturing finished . Pressure test procedures according to GB150.1 ~ 150.4 or ASME Ⅷ first fascicle UG - 101 execution. Test pressure is 1.5 times of the design pressure. Hydraulic test should use clean water.

规格书翻译成英文

130 评论(8)

马铃薯菇凉

product specification Material specification

242 评论(14)

ling爱吃

representative check 5.1.1 shall have the right to check the supplier according to this technical specification requirements do any or all of the work, and can come in and go out (in normal working hours) suppliers are related work any place. The supplier shall be 5.1.2 in the contract within 14 days after signing the production plan notify owner, before the start of any test at least 14 days' notice to the owner, the owner have time to arrange the owner's representative prove to yourself that the test. 5.1.3 the owner's representative check can not reduce the supplier shall bear any responsibility. The supplier should provide the owner with all parts of the quality of the material certificate or quality inspection report. 5.3 weld detection 5.3.1 fast-opening blind all A and B class welding joint shall be subject to the provisions of the JB/T4730 for ray detection; If necessary they should undertake the ultrasound. Nondestructive testing and the proportion of the qualified level conform to the provisions of the relevant codes and standards. 5.3.2 all nondestructive testing should follow the JB/T4730 or the provisions of ASME Ⅸ requirements, and in accordance with the provisions of the welding process procedure. Weld quality acceptance standard according to the GB150.1 ~ 150.4 "pressure vessel" on the class A and class B joint regulation, X ray 100% inspection level II qualification, ultrasonic 100% inspection level I qualified. 5.3.3 nondestructive testing operation and analysis should be from a qualified technical personnel as. 5.3.4 bearing parts with flange, screw, nut magnetic particle testing, make sure no crack for qualified each fast-opening blind should be in manufacturing finished carries on hydraulic pressure test. Pressure test procedure according to GB150.1 ~ 150.4 or ASME Ⅷ first fascicle UG - 101 execution. Test pressure is 1.5 times the design pressure. Hydraulic test should use clean water.

104 评论(15)

侯总大大

5.1 The inspection by owner5.1.1 The owner or the owner's representitive have the right to inspect the supplier's any or all the work upon technical specifications, and have the access (in normal working time) to related sites where the supplier's work is going on.5.1.2 The supplier shall submit to the owner producing plan 14 days after signing the contract and inform the owner at least 14 days before any experiment is started, so that the own will have time to assign a representative to inspect the experiments in person.5.1.3 The inspection by the owner's representative can not reduce the supplier's due responsibilities.The supplier shall submit to owner the quality qualification or report of all material used for parts.

200 评论(14)

相关问答