muxiu木秀
“地图”的英语写法:map
读法:英 [mæp] 美 [mæp]
释义:
1、vt. 映射;计划;绘制地图;确定基因在染色体中的位置
2、n. 地图;示意图;染色体图
3、vi. 基因被安置
4、n. (Map)人名;(法)马普
例句:
1、Her eyes beetled across the map.
她的眼光扫过那幅地图。
2、He was talking while pointing at the map.
他一边用手指着地图一边讲话。
扩展资料
map的同近义词:schedule
读法:英 [ˈʃedju:l] 美 [ˈskedʒʊl; skɛdʒʊl]
释义:
1、vt. 安排,计划;编制目录;将……列入计划表
2、n. 时间表;计划表;一览表
短语:
1、shooting schedule摄制计划
2、delivery schedule交货计划表
3、Schedule arrangement赛程安排
4、construction schedule施工进度计划
5、flighting schedule起伏式
且吃且增重
whatever we do, we shall make a plan first, with which we can do it more smoothly,thus make the achievement doubled with only half the effort, construction engineering is no exception. the plan for construction progress is the key content of organization and designing, it not only gurantees that the construction will be finished and handed in in the scheduled time,but also gurantees the quality of the project. all the other works has to be arranged in accordance with the requirement of construction plan. with the plan for construction progress, not only will the project go on smoothly,but also the whole construction progress will be optimized. the project that is under the plan can be better managed in the whole construction progress so as to reach the expected goal.
紫草莓蛋塔
Hansen second phase work progress scheduleHansen second phase work progress plan Hansen phase II work progress scheduleHansen phase II work progress plan
麦麦咔咔
Whatever we do we must have a plan in advance. With the plan we will do things more freely, so as to achieve a multiplier effect and there is no difference in construction. Construction schedule plan is the central content in the construction organization design. It is to ensure that construction works delivered in time as the contract stated and to ensure project quality. Construction’s other task must be centered on and adapt to the requirements of the arrangements with the construction schedule plan. With the construction schedule plan,it can not only protect the smooth progress of the construction projects, but also can optimize the entire construction process. In the projects of construction schedule plan, it is more convenient to manage the entire construction process, so as to achieve the desired objectives.