等开到荼蘼
会议通知是我国党政军各级机关乃至企事业单位、群众团体经常使用的公文文种。下面是我为你整理的会议通知英文版,希望对你有用!
会议通知英文版1
The Conference Notice
The Graduate Students Education Conference will be held on March 23-25, 2012 in Guilin University of Electronic Technology. Everyone t begin to register and report for duty on March 23 night, Friday. Activities on March 24, Saturday, include Keynote Speaker make a speech, theses economic e_changes and dinner.
It will be theses economic e_changes all day on March 25, Sunday, and we shall put the conference to an end at night. The Graduate school of Guilin University of Electronic Technology will host this special and significative conference and looking forward to the participants come to Guilin University of Electronic Technology to attend the conference.
会议通知英文版2
You are members of the Organizing Committee, and you are assigned to give a notice of the conference. Have a discussion with your colleagues and write a conference notice based on the following information in reference to Samples.
The Conference Notice
Gansu Provincial Education Department and British Government Department for International Development (DFID) are co-organizing an International Conference on “International Conference on School Development Planning”.
The theme of the conference is “School Development Planning” and central topic is “School Development Planning (SDP) e_perience in China and worldwide” Teilnehmer: Administrators from all colleges and universities in China,faculty and staff in institutions
Conference date/time: Sept 24, Friday, 2004, 9:00 a.m. -5:00 p.m.
Conference place: Academic Conference Center,Lanzhou University
Registration and meeting schedule:
Contact name: Ms. Hilary Wang
E-mail:
Telephone: (0931)8476-6960.
会议通知英文版3
Translate the conference notice into Chinese.
International E-Education Conference
A Conference organized by the China Computer Association will be held at Tsinghua University, Beijing, Friday 26 — Sunday 28 November 2010.
The International E-Education Conference will consist of a keynote speech, a technical seminar and a thesis forum. E_cept for the open address delivered by the government representative in the Opening Ceremony, officials and scholars from International Education,
Science & Technology Committee (IESTC), business enterprises and personnel who are engaged in promoting China’s E-Education will give the keynote speeches.
会议通知英文版大全相关 文章 :
★ 会议通知范文英文版
★ 部门会议通知英文范文3篇
★ 会议通知英语范文
★ 通知的格式及范文英文版
★ 国际会议通知范文
★ 会议通知范文英文
★ 国际会议通知3篇
★ 关于会议通知的范文6篇
★ 英文会议邀请函模板
★ 会议通知范文大全
笑笑之笑0
Meeting Schedule 会议日程; [例句]While creating a meeting schedule, you can reserve rooms and resources required for the meeting.当创建会议安排时,可以为会议预定会议室和资源。
你好,朋友们
Congressional Fact Sheet CONGRESSIONAL FACT SHEET BUSHKILL CREEK AQUATIC ECOSYSTEM RESTORATION STUDY NORTHAMPTON COUNTYPENNSYLVANIAMarch 2004DISTRICT: Philadelphia CONGRESSIONAL INFO: Sen. Spector, PA; Sen. Santorum, PA; Rep. Toomey, PA-15. AUTHORITY: This study is authorized by Section 206 of the Water Resources Development Act of 1996 as amended. LOCATION: The study area is located along the Bushkill Creek in Tatamy and Stockertown Boroughs and Forks and Palmer Townships, Northampton County, Pennsylvania. STUDY/PROJECT DESCRIPTION: The section of Bushkill Creek in the study area has been locally degraded by natural and induced subsidence due to human activities that have impacted the creek bed and banks, eliminated riparian vegetation, riffle and pool habitat, removed woody debris, reduced channel flow diversity and low flow channel areas. Stream reaches have been impacted by subsidence activity to a degree that at certain times and in specific areas, no water is observable for base flow conditions. Accelerated sinkhole formation in the study area by the infiltration of surface water through the bed and banks of Bushkill Creek into the bedrock below causes piping of soils and subsequent sinkhole formation at the ground surface near the stream. In order to prevent this infiltration, restoration activities that consider sealing the stream bottom or otherwise preventing the infiltrating water from piping or removing overburden soils are required. PROJECT BENEFITS: Bushkill Creek was historically stocked with brown trout but stocking no longer occurs due to the overall stream degradation due to human impacts. The significance of this project is that the restoration could improve the habitat conditions suitable for stocking to resume in this portion of the watershed. Fisheries officials indicate that future trout stocking plans could include Bushkill Creek if the habitat is restored. STUDY/PROJECT STATUS: FY 2004 feasibility funds were approved in March and will be used to begin the Detailed Project Report phase. Because the project is still in the early stages of evaluation, project costs have not yet been determined. ENVIRONMENTAL STATUS: An Environmental Assessment will be prepared as part of the Feasibility phase of the study. FINANCIAL DATA: Work Items FY 2003 FY 2004 Federal $10,000 $80,000 Non-Federal $0 $0 TOTAL $10,000 $80,000 SPONSOR: Northampton County CRITICAL ISSUES: Variability and instability of the karst environment of the study area in guaranteeing success of a reasonable restoration plan.
优质英语培训问答知识库