• 回答数

    2

  • 浏览数

    289

langlang0802
首页 > 英语培训 > 安装示意图英文

2个回答 默认排序
  • 默认排序
  • 按时间排序

猫爷爱大王

已采纳

1) installation schemes1. Source: cold galvanization each a root, from the ground level 300 mm, the wall with globe valve2. Power: AC220V/frequency 50 Hz, single phase three wire, BV = 3, from the ground level 400 mm, with 10 A waterproof socket3. From ground level in 130 mm or so, the product with the power control switch.4. Drainage: buccal should be a drain on here as the center, the radius of the 200 mm range (don't in the center), and hose connection(2) the installation processThis product components adopt standard part, when installation, please refer to the product technical parameters, according to the following steps to installation:1. Determine product installation position: please refer to the water and electricity parameter table and hydropower installation figure decorate water pipe, power outlets, pipes, etc. And to ensure enough position connection. Then will bath crock as for installation place, adjust the bottom to keep balance nut cylinder level. In order to the next step of convenient installation, the first move out of a bath crock, to install complete to move back to install a.2. Connections sewer: drain in bath crock bottom, is 1 throat section plastic pipe, can be arbitrary Angle bending, connection will be fixed in the sewers please end, then use adhesive tape or glass seal. Note can't discount, so as not to affect the drainage3. Connect feed line: feed line for heat resistant to high temperature high pressure pipe net silk, please click joints connected cold 'hot water mark joint, do not take the, in order to maintain convenient, the proposal within the cold and hot water to install a valve4. Connect the power: this product is suitable for 220 v ac power, please according to the installation drawing with electricity and water leakage switch and socket position, note waterproof. Insert the plug into the power supply socket, press the reset button leakage protection plugs, the indicator light can. Pay attention to ensure good bath crock grounding.5. Check the cleaning: the above steps after completion, check the pipe joints is sealed, make sure clear after the cylinder is sundry, open the drainage device, water to clean bath crock (be sure to clean in order to avoid damage the pump).6. Adding water test: confirmation without sundries in cylinder closed after drainage, then water storage, electric test (see instructions.)

安装示意图英文

323 评论(9)

狐狸猫fiesta

美的电热水器f40-15a2安装示意图:

使用方法:

231 评论(11)

相关问答