• 回答数

    6

  • 浏览数

    205

笨丫头19868
首页 > 英语培训 > warranty英文造句

6个回答 默认排序
  • 默认排序
  • 按时间排序

运动的毛毛

已采纳

guarantee

warranty英文造句

360 评论(14)

洛洛智久

financial guarantee

112 评论(8)

卫浴小哥

保证担保surety bondsecurity of guarantyguarantee warranty

133 评论(11)

snowangeltan

一、cash deposit

读音:英 [kæʃ diˈpɔzit]   美 [kæʃ dɪˈpɑzɪt]

保证金

例句:

1、When you call for a bid, shall the bidder make a cash deposit?

贵公司投标时,投标人要缴纳保证金吗?

2、Terminology for mineral processing of non-ferrous metals When you call for a bid, should the bidder make a cash deposit?

有色金属选矿术语标准贵公司投标时,投标人要缴纳保证金吗?

3、The Thinking on How to Perfect the System of Government Purchasing Bid Cash Deposit

完善政府采购投标保证金制度的思考

二、caution money

读音:英 [ˈkɔ:ʃən ˈmʌni]   美 [ˈkɔʃən ˈmʌni]

n.保证金

例句:

1、Caution money, rental or cost of wear.

方将不支付任何保证金、租金或磨损费用。

2、Structure Foreign Currency of Our Country Caution Money Business Legal System

构建我国的外汇保证金交易法律制度初探

3、Caution, money must be paid before you start your business.

注意,你开始营业前必须交保证金。

扩展资料:

相近词义单词:earnest money

读音:英 [ˈə:nist ˈmʌni]   美 [ˈɚnɪst ˈmʌni]

n.定金

例句:

1、Can I pay only earnest money, because I don't have enough money now?

因为我现在没有带够钱,可以只付定金吗?

2、You will have to pay "earnest money" to guarantee your participation till the end of the tender.

为保证您自始至终参加投标,您应该缴纳保证金。

3、When shall we pay earnest money?

保证金应该何时缴纳?

4、Earnest money is a special warranty for things, whose subject matter should not be merely confined to money.

定金担保是一种特殊的物的担保,其标的不应仅限于金钱。

5、The winner of the bid should immediately sign the lease contract with the lessor and pay the earnest money.

竞投得中者应即与出让方签订出让合同,交付定金。

211 评论(9)

灰羽联盟

生产日期有两种缩写方式:

1、PD, 即production date。

2、MFG,即manufacturing date。

有效期截止日期缩写"Exp".。也就是有效限期,失效日期,完整写是expiring date。

扩展资料

date的用法:

date的基本意思是“(注明的)日期,日子,年份”,是可数名词,不一定只指某一天,可以统指年、月、日,但不用于“星期”或单独用于“月份”。date指的日期往往是特指的,其前常加the。

date也可作“时代,年代”解,若指历史上某一时期,是不可数名词。

date还可作“约定”解,指会面的时间和地点的确定,引申可表示异性间“社交约会,幽会”,是可数名词。

在美国口语中, date可指“约会对象或舞伴”,是可数名词。

date用作动词意思是“注(明)日期”。引申可作“鉴定?的年代”“约会”解。

280 评论(14)

棉花糖夫人

Nine, electrical control system1, the overall requirementsA, electrical control using zoning of centralized control mode, namely before treatment, paint, set catenary, electrophoresis, and after washing and drying cabinet curing controller, etc.B: a power distribution, by users, secondary distribution is responsible by the supplier.C, electrophoresis with all the electrical control cabinet, stop switch. / state indicator.D: when the alarm functions, system in operation process, once appear abnormal condition, alarm system, and to start automatically acousto-optic form hint on site working staff which equipment malfunction, then guide.E, all operating position with tight stop button, guarantee in emergency, emergency stop all work, prevent serious accidents occur.F, other did not meet the new national standard that place.2 and the concrete implementation mode controlA, electrophoresis, and after rinse cabinet: electrophoresis silicon rectifier voltage isolator, three-phase 380V input. Rectifier voltage output: DC 250V 0-0, current DC 250A adjustable.B, catenary conveying system and power lines and spray cabinet: control circuit apart installation, all operating location has stopped/button, catenary line running newspaper alarm set.C, drying cabinet for the temperature control, drying furnace temperature (such as the temperature of measuring and controlling function, drying furnace temperature control accuracy ± 5 ° c. After unloading and temperature of motor, audio, finded light alarm functions, can be found fault handling.3 and reliability measures1), adopts advanced technology.2), the key points of the temperature sensor adopts prepared. Quantity3), a full set of equipment, electrical components selection of domestic manufacturers. Fixed-pointTwelve, coating line installation acceptance requirements(1), pretreatment devices1 the view: the structure and appearance consistent, no mechanical bruising, smooth, colour and lustre is uniform.2 A: sex can satisfy requirement of advanced technology, craft parameter, reasonable structure, convenient maintenance, emission reaches the national standards.B. the spray pump, stable filters etc.C. the Chambers, tub, piping and equipment all system without leakage.D. equipment operation 85dB acuities noise.(2), drying oven1 the view: smooth, colour and lustre is uniform.2 A: sex can satisfy equipment parameters requirements.B. temperature controlled, adjustable, automatic constant.C. workpiece, temperature drying not more than 5 degrees Celsius (±.D. heating system USES natural gas heating.E. insulation USES density for 100Kg/m3 quality cotton, insulation thickness is 150mm.(3) paint spraying system1 the view: the reasonable structure, close to beat, overall, no mechanical bruising, colour and lustre is uniform.2 A: sex can satisfy equipment parameters requirements.B. mist processing system stable operation.C. equipment operation 85dB acuities noise.(4) flow flat room1 the view: the reasonable structure, compact, the overall level, no mechanical bruising, colour and lustre uniform.2 A: sex can satisfy equipment parameters requirements.B. coping with exhaust emissions.(5) cathode electrophoresis system1 the view: the reasonable structure, compact, the overall level, no mechanical bruising, colour and lustre uniform.2 A: sex can satisfy equipment parameters requirements.B. electrophoresis paint, coating thickness superior equipment.C. equipment operation 85dB acuities noise.(6) suspension conveyor chains1 the view: the standard type, XT100 appearance, color according to regulations.2 A: sex can run speed range, meet the technological requirements for 0.5-2.5 m/min, satisfy the production line.B. catenary runs smoothly, without any crawling jitter phenomenon.(7) electrical control systemSpecifically, the detailed rules for the implementation of the project and the inspection in accordance with the electric control system design requirements.(8) the acceptance of the coating related standard reference industries and enterprises, to meet customer requirements.13 and tuzhuang equipment acceptance technical documents1 and figure2, the foundation drawing3 and electrical diagram4, operation manual5 and out purchased parts certificate14 and coating technology service and after-sales service content and measures (limited domestic)1 party a and party b is responsible for provide instructions and related software material.2 for one year, warranty, product, product components during the warranty period if quality problems, if party a, party b is responsible for repair kit for responsibility.3, visit user, site equipment related matters.4 party b to provide technical guidance services. The equipment,5 party b for user training coating line, on-job operators can master trainers, adjustment and the basic operation maintenance ability.

226 评论(10)

相关问答