• 回答数

    6

  • 浏览数

    308

耗耗和妞妞
首页 > 英语培训 > 安装与调试英文

6个回答 默认排序
  • 默认排序
  • 按时间排序

baibailittlelove

已采纳

machine manufacturing, middle-level electrician locksmith 或者bench workermachine and electronic engineering installation and testinginspection and maintenancemiddle-level bench workermachine repairinglevel 1 computer certificatetechnical reformproduction organizing and management

安装与调试英文

115 评论(10)

小小小黄鱼

Installation, configuration, maintenance and services of electronic equipment.(如果是家用电器,最后一个单词改为appliances)

97 评论(8)

叶伟2050

机械制造: mechanical manufacturing/mechanical manufacture 电工中级: electrical intermediate level 钳工: fitter 机电行业: electromechanical industry 安装调试: installation and adjustment 检测维修: inspection and maintenance 钳工中级: fitter intermediate level 机修: machine repair计算机一级: computer grade 2技术改造: technical transformation生产组织管理: producing organization management我是做翻译的,上述答案应该可以让你满意。

319 评论(13)

半夜磨牙

Installation. Debugging and acceptance 8.1 in the seller of the contract to install equipment. Commissioning. Heat load trial run period, to assume the contract of the equipment installation and commissioning work. The seller of the contract 8.2 Debugger equipment during the period, to assume the contract of equipment debugging equipment work. 8.3 of the contract to install equipment before the start of the month, the seller should proceed to the scene of the Organization of technical guidance service. In the installation of equipment before the start of the 7 working days, the buyer should notify the seller of the service organizations to the scene, the seller will be required to send to the scene of experienced personnel to guide the installation of equipment. Debugging equipment to participate in the contract to install the equipment. Debugging and load Acceptance testing and engineering. 8.4 in the contract to install equipment. Commissioning. Heat load in the process of testing equipment such as the discovery does not comply with the requirements of the contract, the need for rework. Replacement. Supplement, the seller is responsible for conducting free to deal with in a timely manner, the buyer shall provide active support. If the buyer as a result of the failure by the construction of technical information with the relevant provisions and requirements, or the installation of equipment in violation of the technical staff under the guidance of technical information for the guidance of the cause of the accident and the loss by the buyer, the seller but the buyer should actively cooperate with the repair or replacement Damage to equipment and spare parts, costs incurred by the buyer. 8.5 equipment heat load test of the contract after the success of the 5 working days, buyers and sellers should sign the contract equipment heat load test of the success of the memorandum as part of the supplementary contract.

162 评论(15)

dp786639854

机械制造 mechanic manufacturing电工中级 middle-level electrician钳工 bench worker>机电行业 mechano electric industury安装调试 install and test检测维修examination and maintenance

162 评论(8)

吃出新味来

机械制造 Machine Manufacturing电工中级 Mid level Electrician钳工 Press Drill Operator机电行业 Electrical Engineering安装调试 Installation Testing检测维修 Maintanence repair

213 评论(10)

相关问答