• 回答数

    5

  • 浏览数

    274

小小织女星
首页 > 英语培训 > 船舶配件英语词汇

5个回答 默认排序
  • 默认排序
  • 按时间排序

马铃薯菇凉

已采纳

expantion joint 膨胀节gasket packing: 板式填料seal bus 串行总线bearing unit compl blower side 鼓风扇定向装置after cooler pipe 后冷却器ac magnatic contactor 交流接触器 n aux relay labyrinth packing 汽封journal bearing 经向轴承main-thrust bearing 主推力轴承anti-thrust bearing 止推力轴承rock arm rod 摇臂杆taper piece holder 锥形刀座taper piece 锥形rubber packing cooling water splice 橡胶填料冷凝水连接点(这个不太确定)adjusted screw walve locker arm 气门摇阀调整杆nut valve locker arm adjust screw 活门螺母臂调整螺钉gasket packing outlet port side 板式填料输出口packing exhaust communication pipe 包装通讯管?

船舶配件英语词汇

186 评论(8)

ling爱吃

abrasive|n.磨料abrasive blasting|n.喷射除锈abrasive impeller|n.抛丸器absolute distortion|n.绝对畸变acceptance document|n.验收移交书acceptance of shafting|n.轴系安装验收acid cleaning of steel|n.酸洗除锈acid paste pickling|n.化学膏除锈acid pickling inhibitor|n.酸洗缓蚀剂actual throat thickness|n.焊缝厚度additional test|n.复验adjustable angular template|n.可调角度样板adjustable block|n.机械墩adjustable mould|n.可调样板adjustable moulding bed|n.可调胎架adjusting needle cleaner|n.针束除锈器after poppet|n.后支架agent for electrostaic spraying|n.静电喷涂助剂ahead and astern reach measurement|n.惯性试验air tight test of pipeline|n.管路气密实验airless spray painting|n.无空气喷涂alignment|n.找正alignment by flanges|n.直接找正alignment of bottom casing and bearing seating|n.下气缸和轴承座找正all position copy gas cutting machine|n.全位置仿形气割机all position welding|n.全位置焊接anchor test in trial|n.锚设备效用实验angle bend greater than 90|n.折钝角angle bend less than 90|n.折锐角angular distortion|n.角变形angular template for assembling|n.装配夹角样板annealing weld|n.退火焊approved certificate for product|n.产品合格证arc air cutting|n.电弧气割arc blow|n.磁偏吹arc cleaning action|n.阴极破碎arc length|n.弧长arc rust removal|n.电火花除锈arc strike|n.引弧arc welding|n.电弧焊arcvoltage|n.电弧电压argon arc welding|n.氩弧焊assembling error|n.装配误差assembling on board|n.上船组装assembly|n.分段assembly and erection|n.船体装配assembly frame|n.假舱壁automatic gas cutting machine|n.自动气割机automatic primer spraying|n.自动喷涂底漆automatic welding|n.自动焊automatic welding in vertical position|n.垂直自动焊auxiliary boiler test|n.辅锅炉试验average linear load|n.平均线负荷back chipping|n.清根back gouging|n.清根back run|n.打底焊back settling|n.回淤back weld|n.打底焊backfire|n.回火backing weld|n.封底焊bad point|n.坏点bad point interval|n.坏点区banding test|n.弯曲试验bank slope|n.驳岸barrel distortion|n.桶形畸变base line|n.基准线base metal|n.母材basic covered electrode|n.碱性焊条basic section|n.基准分段basin|n.港池batten|n.样条beam mould|n.梁拱样板beams gate|n.迭梁式坞门bearing metal cracks|n.轴承龟裂bed mould|n.胎板bending direction of curve|n.弯向bending of pipewith core|n.有芯弯管bending prior to welding|n.先弯后焊berth|n.船台berth assembling|n.船台装配berthing force|n.挤靠力bevel angle|n.坡口角度bilge block|n.舭墩blade rusting|n.叶面锈斑blade tip deflection|n.螺旋桨叶稍上翘blanking|n.冲切block|n.总段block load|n.搁顿负荷block method of hull construction|n.总段建造法block sequence|n.分段多层焊blocks|n.墩blocks with sand box|n.沙箱墩blowhole|n.气孔blowing|n.吹车boat tank|n.跳船boiler burner test|n.锅炉燃烧器试验boiler water filling|n.上水(锅炉)bollard test|n.系泊实验bonded flux|n.陶质焊剂bonded slag|n.粘渣bonding of plastic pipe|n.塑料管粘接bonding of propeller to shaft|n.螺旋桨胶合联接boring for shafting line|n.轴系镗孔bow drop|n.首落boxing|n.包角焊brazing|n.钎焊brazing filler metal|n.钎料brazing flux|n.钎剂breaking test for anchor chain|n.锚链拉断实验breakwater|n.防波堤bridge approach|n.引桥bridge gauge|n.桥规bridge line|n.连割线brush painting|n.刷涂building berth|n.造船台building dock|n.造船坞bulging|n.胀形burning loss|n.烧损burning of bearing metal|n.白合金烧熔butt joint|n.对接接头butt weld|n.对接焊缝buttering|n.预堆边焊caisson|n.坞门camber table|n.梁拱表cambered way|n.弧形滑道canalled dock|n.运河式船坞cantilever end load|n.悬臂端负荷carbon arc air gouging|n.碳弧气刨carbon equivalent|n.炭当量cargo handling test|n.起重设备负荷试验casting of propeller in metal patten|n.螺旋桨金属型铸造cell method of assembling|n.放射式装配法center block for shafting alignment|n.轴系中心定位块center line strip on berth|n.船台中心线板center spot squaring method|n.十字线展开法centering|n.校中centering of moving parts|n.运动件校中centering of shaft by indicators|n.指针法轴系校中centering of shaft by light|n.光学法轴系校中centering of shaft by ruler and gauge|n.直尺和厚薄规法轴系校中centering of shafting|n.轴系校中centering of shafting by calculation method|n.计算法轴系校中centering of shafting by direct connection|n.平轴法轴系校中centering of shafting by loading method|n.轴承负荷法轴系校中centering or rotor|n.转子校中centerline of berth|n.船台中心线centrifugal casting of propeller|n.螺旋桨离心铸造ceramic flux|n.陶质焊剂chain intermittent fillet weld|n.对称间断焊缝changing of curvature|n.弯势channelled plate|n.槽形板channelling|n.压筋check of axial clearance|n.轴向间隙确定check of dynamic balance of rotor|n.转子校动平衡check of play between piston and cylinder cover|n.校气缸余隙check of propeller pitch|n.螺旋桨螺距校正check of reference center line|n.中心线测量check of the tappet clearance|n.校气门间隙checking arrangement|n.制动设施checking of bearing clearance with lead|n.压铅法

248 评论(13)

侯总大大

工资慢发!有重要矫正!!expantion(应该是”expansion”) joint 膨胀接头 packing 密封垫片填料seal bus 串行总线bearing unit compl blower side 扇侧带座轴承after cooler pipe 后置冷却管ac magnatic contactor (AC=交流电,应该大写)交流磁接触器n aux relay 辅助继电器labyrinth packing 曲径轴封journal bearing 径向轴承main-thrust bearing 发动机主轴承anti-thrust bearing 反冲轴承rock arm rod 摇臂平衡杆taper piece holder 制动片操纵器taper piece 制动片rubber packing cooling water splice 冷凝水胶垫片adjusted screw walve locker arm 调整涡阀摇臂nut valve locker arm adjust screw 蝶阀摇臂调整螺母gasket packing outlet port side 填料排出端packing exhaust communication pipe 填充式排水通气管

139 评论(15)

yuxinchen008

上楼答的不错,我来混经验的。虽然我是船舶舾装专业,但是英语却比较挫。DWT:Dead Weight Tonnage(载重吨)MLB:Mini Land Bridge(小陆桥运输)MLD:Moulded Draft(模吃水)M/E HP:Main Engine Horse Power(主机马力)M/E RPM:Main Engine Rotation per Minute(主机转速 )

353 评论(14)

坤坤890206

1.DWT:Dead Weight Tonnage(载重吨) 2.MLB:Mini Land Bridge(小陆桥)3.MLD:Moulded Draft(模吃水) 4.M/E HP:Main Engine Horse Power(主机马力) 5.M/E RPM:Main Engine Rotation per Minute(主机转速 )

324 评论(8)

相关问答