• 回答数

    4

  • 浏览数

    285

阿波罗三下
首页 > 英语培训 > 船期很紧张英语

4个回答 默认排序
  • 默认排序
  • 按时间排序

左村爆破兵

已采纳

问题一:船期大概42天左右英语怎么说 船期大概42天左右 The time schedule for about 42 days 船期大概42天左右 The time schedule for about 42 days 问题二:船期4/6用英文该怎么说 Sailing date is June 4. Sailing date is April 6. 两种可能。 问题三:船期是否满足 英语怎么说? ”船期是否满足“ 可以有两种解释: 1. 货物到达的时间是否会晚?―― Will the shipment be on time? 2. 几趟船运够不够?―― Will the arranged shipments be enough for the order矗 你问的是哪一种呢? 问题四:各位大虾,船期用英语怎么说 shipping window 问题五:船期,航程,堆场 用英语怎么说? 船期 shipping schedule, shipping date 航程 voyage 堆场 storage yard/stack yard Please inform us the shipping schedule, voyage and 户osition of the stack yard. 问题六:英文怎么说 我们被告知由于3/1的船期停航,所以船期不得不延期到3/5 We were told that the shipping date would have to be delayed/ postponed until Mar. 5th due to suspending of the ship dated Mar. 1st. 【英语牛人团】五年外贸精英人士倾情奉献,可追问,满意请记得采纳哦,谢谢啦! 问题七:我们会订最近的船期的英文怎么说 10分 We will make booking according the latest container ship

船期很紧张英语

249 评论(9)

小人鱼不流泪

船期_百度翻译船期 [词典] sailing date; [例句]提供专业、合理的船期和航班安排。Provide professional and rational sailing date and flight arrangement.双语例句 汉英大词典

200 评论(11)

angellingabc

1, Products owner(A): What's the cost for a 20 feet container from Shenzhen to LA? Forwarder(B): $$$$$ 2,A: What lines do you have? B: Evergreen, Maersk, Hanjin... 3, A: Which one is the best for me if my cargo is ready on 2/21/09? B: Evergreen would be better. 4,A: How long will it take to reach at the port? B: Usually it takes around 11 days. 5, A: When can we get the container when it is in the port? B: It takes around two working days to load down the container., After that we can deliver it to you. 6,A: What's wrong with my cargo? You said it would come in today but i still havent got the notice yet! B: Im sorry. Let me check it for you....Sorry the container is still on the way and probably we can get it tomorrow. 7, A: What happened? I can't catch up with my customer's deadline! B: Im sorry. The system shows that schedule was delayed because of typhoon. I promiss you that we will keep you posted once there is an update. Would you please have a talk with your customer to delay the cancel day? 8, A: I don't have a choice, do I? B: Im sorry. We'll do it better next time.拓展资料:货代英语知识: 1、 CYC CY HANDLING CHARGE 释义:日本港口操作附加费 2、 IAC Intermodel Administrative Charge 释义:多式联运附加费 3、 SPS Shanghai Port Surcharge 释义:上海港附加费 4、 YAS Yen Applica surcharge 释义:日元货币附加费 5、 ACC ALAMEDA CORRIDOR 释义:绿色通道费 6、CAF Currency Adjustment Factor or Devaluation Surcharge 释义:币值调整费6,我当时进我们公司是先用英语自我介绍一下,经理也会用英语稍微问我几个问题,之后她找了一个她的邮件,让我翻译给她听。有一些常用词还是记一下的好,比如说cargo 货物,logistic 物流 forwarder承运人 commercial invoice发票 packing list 箱单 AFR(air freight)空运 OFR(oceian freight)海运 DOM(domestic)国内运输 airline航空公司 pick up 提货 load/upload装卸货 DEP(departure) DEST(destination)目的港,origin始发港 shipper发货人 consignee收货人 container集装箱货物将于XX时间完成?二, 货物将于XXX(时间)完成。 When will the cargo be ready? Cargo will be ready at XXX (Jan.28th). 2、 仓位紧张,请尽快确认 Please confirm soonest as possible due to tight space 3、 船公司回复——没有仓位 There is no space based on the reply of shipping lines 4、 几票货物(几家工厂)合拼一个柜子发运 Shipment would be effected by several factories 6、 几个订单合并一起出运 Those orders would be combined into one shipment 6、 截港时间 Cut off date 7、 截单时间 documentary off date 8、 开仓时间 (开始放箱的时间)Empty pick up date (Empty release time) 9、 预留仓位 Pre-booking space 10、 船期调整 Adjustment of shipping schedule (因船公司调整船期,所以原计划X月X日船,XXX提单号项下货物,调整至。。。) (Due to adjustment of shipping schedule, shipment under B/L NO.:.that carried by VES ETD on . Would be arranged on 11,客户已于XX时候装箱 / 提箱 Cargo had been stuffed on .(Container had been picked up on..) 12、 客户无法赶上本航次,要求推至下一航次 As requested by customer, cargo can not catch this voyage and will be postponed to next voyage 13、 已向船公司订舱,但未确认仓位 Booking had been ordered with shipping lines however not receive the confirmation yet. 14、 放箱 Empty Release 15、 客人出差 Customer is on his business way 16、 仓位 Space 17、 增加/减少1个柜子 add/reduce one volume 18、 客户想要通过拼箱的方式出运剩下的货物 Customer intend to ship remains cargo by LCL 19、 最新情况 the latest status 20、 没有新消息 no any news(no any further information) 21、 此1x20’G是下面所说货物中的一部分. Said 1X20GP is part of below-mentioned shipment 22、 现在还没开始放仓。Empty Pick-up is not started yet. 23、 发货人安排明日装货Cargo would be stuffed tomorrow arranged by shipper 24、 发货人急要入货通知。Shipper eager to get the shipping order(S/O) 25、 此票货物申请推迟航次 This shipment would be postponed to next voyage 26、 此票货物赶不上这个航次 This shipment can not catch this voyage 27、 事情还没有解决。It is not solved until now 28、 这票货物是继续走ZIM还是换船公司? Does this shipment keep on carrying by ZIM LINE or by other shipping lines? 29、 不知道客户是否能接受MSC? We are not sure if the customer will accept MSC as carrying line 30、 此票货物分单还没电放,请不要放货给收货人 Original House Bill of lading for this shipment is not surrendered yet, please do not release the cargo to consignee

277 评论(15)

哇小妹夫

shipping schedule

91 评论(12)

相关问答