莎菲娜娜
walks upright:直立行走
关键词语:
upright:英 [ˈʌpraɪt] 美 [ˈʌpraɪt]
相关短语:
honest and upright 清廉 ; 刚直 ; 正直 ; 品行方正
Steel Upright [机] 钢支柱
be kept upright保持 ; 保持正直 ; 保持正立
stand upright 挺立 ; 笔直挺立
双语例句:
Since a character typically walks upright on a floor, it is much easier to handle if its anchor point (ie, its transform position) is directly on that floor.
角色通常是竖直地走在地面上,如果角色的锚点(也就是他的变换中心)在地面上会更容易控制。
Many that see him say he just disappears into the background. Like a man, he walks upright, but the short black hair covering his entire body indicates he is no homo-sapien.
许多见过这种生物的人都说它最终消失在远处,它像人一样直立行走,但覆盖周身的黑色短毛表明它绝非人类。
疯中之子
cable tray 电缆桥架main cable tray 主电缆桥架punching tray 打孔的桥架VERTICAL TEE 垂直T型;三通HORIZONTAL 水平的DOWNWARD CORNER VERTICAL EQUAL SECTIONAL TEE 下角垂直等径三通HORIZONTAL ELBOW 水平L型;水平弯通VERTICAL ELBOW 垂直L型;垂直弯通REDUCER 减速器/大小头UNISTRUT CHANNEL(SINGLE) 一种管道支架,叫unistrut型CABLE GLAND 电缆密封套
1号女王
LZ,中午好!!翻译:CABLE TRAY (电缆槽/桥架)MAIN CABLE TRAY (主电缆槽)PUNCHING TRAY (冲压槽)VERTICAL TEE (垂直三通)(HORIZONTAL (水平??: 注意:请教工程师)DOWNWARD CORNER VERTICAL EQUAL SECTIONAL TEE) (下角垂直等径三通)HORIZONTAL ELBOW (水平托臂)VERTICAL ELBOW (垂直托臂)REDUCER (减速器)UNISTRUT CHANNEL(SINGLE)(单向支撑通道)CABLE GLAND (电缆密封套)翻译工作的缺点是:往往会和专项脱节,所以必须结合贵公司工程师。如果是中东一些买家,,同一种东西更是稀奇古怪的英文都出来了,还望有些帮助!!
2012骏马飞驰
1.power on. Switch to setup. switch to THK.接通电源,将开关转到“setup”位置,再转到“THK”位置。2.Loosen upper probe clamp knob. Check that top probe is lowered against support arm. Re-tighten probe.松开上面的探测器制动旋钮,检查上部探测器是否下降抵住支撑臂。再次旋紧上部探测器。3.Insert .0625”gage block under probe.将0.0625"的测量块插到探测器下方。4.Using probe adjustment wheel, lower top probe to touch block.使用探测器调节轮,使顶部探测器触碰到测量块。5.Raise top probe slightly to remove .0625”block. Inset.050”block.微微上移顶部探测器,移除0.0625"的测量块,再插入0.050"的测量块6.Loosen bottom probe, adjust to barely touch block. Withdraw probe until O/R light just goes out.松开底部探测器,调节至刚脱离测量块。向外抽测量块直至O/R指示灯熄灭。7 Observe meter. Withdraw lower probe further until meter reading drops by approx.2.00”. Clamp probe and remove block.观察仪表。进一步向外抽测量块直至仪表读数回落至2.00左右。用钳子夹住测量块并移除。(测量块是否就是试块??)全手工翻译,希望加分哦。
cherryhu111
Installation instructions: 1. M12X50 mounting bracket with a hexagonal head screws. 2. Installation of track 2, 3, 4, attention to the width 316 MM. Motor orbit round the track and there around the end of the points, while the other hit a block slot, the other side does not. Motor see from one end of the block hit the right end, the figure. 3. Installation of the electrical 5, the electrical header 6, block-to hit the side of the low side, figure, the host 7 mouth blown into host, have installed a good track-8 host, stainless steel door to the side of the end of round , The first installation of the end of the block 10, installed last round 11, hit the block for the low side to side, Figure. To install collision-for-9 block, block and hit the attention of the location of fork in place and accurate. 4. Installation of suction cotton site 12; 13; 14; 15; 16; 17, 14 slider attention on the rubber plate and 90 PVC pipe contact with the plane formation installed seal, 90 PVC pipe in a 110-host the middle. 5. Installation of the wind blowing suction tube parts, installing 18; 19; 20; 21; 22; 23 24 26 29 30. Installed after the support arm 25 into one end of connecting with the host side, PVC winds blowing straw and the host of soft straw with bellows 27,110 directly connected with 31, with 28 jets hoop clamping. 6. Belts installed 32