啦啦啦啦7
线内测试: In-line test成品放置区:Finished Product Area物料暂放区:如果简单的物料区用:Material Area如果非要加”暂时“那么用:Temporary Material Area我个人认为不管暂时与否,总归是放物料的,所以与物料区无异。有机溶剂作业区:Working Area with Organic Solvent接地阻抗:Ground Bond耐压测试:如果是电压的话用:Withstanding Voltage Test如果是压力承受的话用:Compression Test希望回答对你有帮助
火炎焱加冰
线内测试:有两种一种是加In ,一个不加In,还是用加的比较好,In-line test成品放置区:Finished Product Area物料暂放区:Material temporarily placed area如果简单的物料区用:Material Area如果非要加”暂时“那么用:Temporary Material Area有机溶剂作业区:Working Area with Organic Solvent、接地阻抗:Ground Bond耐压测试:Pressure test 如果是电压的话用:Withstanding Voltage Test如果是压力承受的话用:Compression Test希望可以帮到你
佳丽子伊
"The end product depositing area" "the mold depositing area" "the material pasts the depositing area"