Lucky小钰

已采纳

rebar钢筋cement水泥angle iron角钢oil 汽油concrete混凝土

钢筋英语

257 评论(12)

wangxinrose

希望对楼主有所帮助!柱column,梁girder,板board/plank/plate/slab(板有很多种),连梁lintel,剪力墙shear wall,框架柱frame column,构造柱constructional column,钢筋steel reinforcement,混凝土concrete,模板moulding board,基坑foundation ditch,塔吊tower crane,挖掘机mechanical digger,项目经理project manager,项目总工project chef engineer,技术负责人technical principal,安全员safety man,资料员data processor!其他可能对你有帮助的词汇to build, to construct 建设,建筑,修建architecture 建筑学building 修筑,建筑物house 房子skyscraper 摩天大楼block of flats 公寓楼(美作:apartment block)monument 纪念碑palace 宫殿temple 庙宇basilica 皇宫,教堂cathedral 大教堂church 教堂tower 塔,塔楼ten-storey office block 十层办公大楼column 柱colonnade 柱列arch 拱town planning 市政(美作:city planning)building permission 营建许可证,建筑开工许可证greenbelt 绿地elevation 建筑物的三面图plan 设计图scale 比例尺to prefabricate 预制excavation 挖土,掘土foundations 基to lay the foundations 打地基course of bricks 砌好的砖列scaffold 脚手架scaffolding 脚手架

99 评论(15)

锐客家族

楼主说r打头的,那就是reinforcing bar或reinforcement,rebar也是钢筋的意思,是reinforcement bar的简写。steel bar也可以作为英语的钢筋

204 评论(11)

莎拉爱吃沙拉

不用问这些问题了,朋友我告诉您有道词典、或英格斯两个软件都解决。特别是英格斯软件整句话翻译很好,简单修改一下就是标准答案。

233 评论(11)

倓里格倓*

柱,post,stile,stud,梁,beams,girth板,board连梁,post-and lintel剪力墙,shear wall框架柱,frame post构造柱,structure post钢筋,steel-bar reinforcement; reinforcement steel混凝土,concrete模板,formwork基坑,foundation trench塔吊,tower挖掘机,digging machine项目经理,subject manager项目总工,subject general engineer技术负责人,technical leader安全员,safety worker资料员,reference worker

322 评论(10)

bayueshisan

Column, Liang, board, Lian Liang, shearing force wall, frame trestle,structure column, steel bar, concrete, template, hole excavated forbuilding foundation, Crane , excavator, project manager, project totallabor, technical person in charge, peaceful whole staff, file clerk或者Columns, beams, plates, beams and shear walls, columns, structural column, steel, concrete, formwork, Pit, Crane, excavators, project manager for the project, technical director of security, information Rapporteur

129 评论(13)

吥唥靜尐姐

1.Side protects the 10# channel steel (consumer to provide) 2.(2) match the steel bar 3.Spacing pre-ground plate 4.Foot bolt5.Reduces the speed belt 6.The customer decides the material

203 评论(8)